BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Hoffman Estates, Illinois. Completed plans call for site work for a sidewalk / parking lot; water / sewer project; for paving for a sidewalk / parking lot; and water / sewer project.

The Village of Hoffman Estates is accepting sealed bids for the proposed work officially known as the 2022 Drainage Improvements Project, and is located at various sites in Hoffman Estates. For work to be constructed under the provisions of the Standard Specifications for Road and Bridge Construction published by the Illinois Department of Transportation, current edition. The proposed improvements include, but not limited to, reinforced concrete storm sewer pipe, solid and perforated PVC pipe installations, connection to existing drainage structures, new yard inlet and catch basin, furnish new frame and grates, inlet filters, pavement patching, sidewalk, curb, regrading and sodding and related improvements not listed herein. All proposals must be accompanied by a proposal guaranty as provided in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals contained in the Local Roads and Streets Recurring Special Provisions. The Village of Hoffman Estates strongly encourages minority firms and women's business enterprises to apply. If subcontracts are to be let, the primary contractor shall take these same affirmative steps to solicit bids from minority and women's firms. The Village of Hoffman Estates reserves the right to reject any or all proposals and waive any informality in bidding and to accept the proposal deemed most advantageous to it, all in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals contained in the Local Roads and Streets Recurring Special Provisions. Prevailing Wage Requirement: Yes Bid Bond: 5% Completion Date: 25 Working Days Liquidated Damages of $1,425 per day will be assessed if the backfilling of the parkway or private property is not completed within the above stated time frame.

Bid Results

Water / Sewer

$209,000.00

Public - City

Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
130
Bidding Soon
2,074
All Active Projects
886
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2022

October 26, 2022

img_map_placeholder

Multiple Locations, Hoffman Estates, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.