BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Camarillo, California. Completed plans call for site work for a playground / park / athletic field.

Pleasant Valley Recreation and Park District ("District") is seeking bids for the resurfacing of the six (6) Tennis Courts located at 5501 Mission Oaks Blvd, Camarillo CA 93012 to the specifications. This is a Prevailing Wage Project. DESCRIPTION OF WORK: A. High Pressure wash all 6 courts to remove Blistering and Peeling Coating and to have a clean surface to work with B. Grind high edges of cracks caused by slab rebar close to the surface C. Remove raised hollow area of concrete slab where rebar is too close to slab surface D. Cut out rebar and fill void with cement modifier E. Repair cracks and spalls with Acrylic Crack Patch by SportMaster F. Apply by squeegee One (1) coat of Acrylic Resurfacer Coating with #90 silica sand G. Apply by squeegee One (1) coat of SportMaster Acrylic Texture System with #90 silica sand H. Apply by squeegee One (1) coat of SportMaster Color System with no silica sand (paint the same colors as the courts are now) I. Paint Two (2) inch play lines by hand between masking tape (White) J. Caulking: Remove existing material in Center expansion joints and install self-leveling caulking in center expansion joints Refer to manufacturer's specifications unless otherwise noted herein, the basic of specifications for this project shall be the Standard Specification for Public Works Construction (the "Green Book") latest edition. District staff will review the proposals. The selected Contractor will be contacted to let them know they have been awarded the bid. Within ten (10) days of the District's Contract award, the contractor shall submit a Preliminary Construction Schedule, outlining the various items of work. Contract award November 3, 2022 Project start date approx. November 28, 2022 Project completion date no later than December 16, 2022 The work to be performed under this Specification, No. 2021-02 consists of furnishing, by the Contractor in accordance with the contract drawings and specifications and subject to the terms and conditions of the Contract, all materials, equipment, tools, labor and incidentals necessary for the construction of the proposed project, complete and in place. The Pleasant Valley Recreation and Park District Board of Directors will make the final award. No other officer or agent may obligate or bind the District.

Award

Playgrounds / Parks / Athletic Fields

$86,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
82
Bidding Soon
1,670
All Active Projects
742
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2022

November 28, 2022

img_map_placeholder

5501 Mission Oaks Blvd, Camarillo, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.