BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a road / highway in Lakeland, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Construction began March 2023. District: 08 Counties: POLK Road Name: CENTRAL POLK PARKWAY - (SR 570 TO SR 35) Limits: 16471000 Project(s): 44089725201(*) Federal Aid No: N/A Project(s): 44089725202 Federal Aid No: N/A Total Roadway Length: 12.000 Miles Total Bridge Length: 1.097 Miles Total Proposal Length: 13.097 Miles Contract Days: 2257 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Work consists of providing all labor, materials, equipment and incidentals necessary for over six miles of new roadway from MP 0.000 (SR 570) to MP 6.232 (US 17). The project also includes two new interchanges at SR 570 and SR 540 and terminates at US 17 with an at-grade intersection. Additionally, milling, resurfacing and widening will occur on SR 570, SR 540 and US 17. Central Polk Parkway (CPP/SR 570B) will be a new four-lane rural divided, limited access, All -Electronic Tolling (AET) facility in Polk County, Florida. No Pre-Bid Conference. Contractor must be prequalified. For projects in excess of $50 million, in addition to meeting all other qualification requirements of Section 337.14, Florida Statutes, and Rule Chapter 14-22, Florida Administrative Code, any Contractor who is not prequalified and in good standing with the Department as of January 1, 2019, must submit evidence which demonstrates satisfactory completion of at least two projects, each in excess of $15 million, for the Florida Department of Transportation or for any other state department of transportation. Acceptability of the evidence related to the two projects is at the sole discretion of the Department. FLDOT - Central Polk Parkway - (SR 570 TO SR 35)

Under Construction

Roads / Highways

$257,758,570.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

142 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
74
Bidding Soon
1,393
All Active Projects
526
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

March 27, 2023

img_map_placeholder

Polk Pkwy, Lakeland, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.