BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in Columbia, South Carolina. Completed plans call for the renovation of a medical facility.

The objective of this project is for the contractor to provide all labor, new materials, and new equipment necessary to totally replace all parts and components of Elevators 1 - 6 and 9 within their respective existing elevator shafts at Moncrief Army Health Clinic, BLDG 4500, Ft Jackson SC. This includes all associated electrical components, controls/controllers, fixtures, door rollers, pickup rollers, door gibs, bearings on door operator linkages, governor systems and ropes, cabs and cab interiors, cab lighting, floor landing indicators, and hallway elevator panels, floor call controls in accordance with the most current versions of Unified Facilities Criteria (UFC) 3-490-06 (Elevators); UFC 4-510-01 (Design: Military Medical Facilities); CFR 1917.116 - Elevators and escalators; ASME A17.1-2010, Safety Code for Elevators and Escalators / CSA B44-10, Safety Code for Elevators; applicable National Fire Protection Association (NFPA) codes, and all state or federal applicable laws and codes whichever is more stringent. Elevators 7, 8, and 10 are not part of this project. The existing, direct-current (DC) powered, traction geared elevators shall be totally replaced with an alternating current (AC) powered, traction gearless elevator system, to include all nonproprietary software and hardware (e.g. laptops) with updates. Total replacement includes any required upgrades to the existing electrical power system to make the transition from DC to AC usage for Elevators 1 - 6 and 9. The contractor shall provide all labor, materials, equipment and supervision necessary to safely complete the repair/renewal activities in accordance with the provisions of the base contract in accordance with all Federal, State, and Installation codes and laws to include preparation of a design as discussed below. Value: $1-5 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Medical

$5,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
61
Bidding Soon
768
All Active Projects
357
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2022

November 23, 2022

img_map_placeholder

4500 Stuart St, Columbia, SC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.