BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Tea, South Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The City of Tea, SD, requests formal bids for the James Avenue Drainage Project in Tea, SD. Pre-Bid Meeting Info: There will not be any pre-bid meeting for this project In accordance with South Dakota Codified Law 5-18B-1, one copy of the Plans and Specification shall be furnished, without charge, to each Contractor resident in South Dakota who intends, in good faith, to bid upon the project. This project consists of roadway surfacing removals, installation of storm sewer utilities (reinforced concrete pipe and structures), general earthwork associated with grading, concrete lined drainage swale, aggregate roadway base, concrete and asphalt surfacing, and temporary and permanent erosion control. Each Bid for this project must be accompanied by a guaranty in the amount of 10% of the total amount bid or in lieu thereof a certified check, cashiers check, or bank draft in the amount of 5 percent of the amount of the bid. Satisfactory forms of proposal guaranties are certified checks, cashiers check, or bank draft issued upon a national or state bank, and bid bonds issued in accordance with South Dakota Law and made payable to the City of Tea. The Bid Proposal Guarantee will be retained by the OWNER as liquidated damages if the successful bidder refuses or fails to enter into an Agreement within twenty (20) days after Notice of Award or fails at time of executing the contract to furnish a Contract Performance Bond guaranteeing the faithful performance of the work. The Bidder to whom the contract is awarded will be required to furnish a Contract Performance Bond to the OWNER in the amount of one hundred percent (100%) of the contract award. The Contract Performance Bond will remain in effect for not less than one year after the date of the City of Teas letter of Final Acceptance. A Certificate of Insurance will be required from the successful bidder prior to beginning work. Bids may not be withdrawn after the time fixed for opening them. The City of Tea reserves the right to reject any and all bids, waive technicalities, and make award(s) as deemed to be in the best interest of the City of Tea, SD. The City of Tea is an Equal opportunity provided and employer. Project Completion Date is May 31, 2023 Interim Completion Date for the completion of installation for the Concrete Drainage Channel is November 18, 2022 Street surface removals will not be permitted between November 4, 2022 and March 3, 2023 Roadway surfacing removals and road surface restoration is limited to 21 Calendar Days.

Post-Bid

Water / Sewer

$415,000.00

Public - City

Paving, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
17
Bidding Soon
236
All Active Projects
121
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.