BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Afton, Iowa. Completed plans call for site work for a playground / park / athletic field.

Three Mile Lake Campgrounds - Division 1 - Sewer and Water Improvements - Sanitary Sewer Gravity Main, Trenched, PVC, 6" - 610 LF; Sanitary Sewer Force Main, Trenched, HDPE, 2" - 930 LF; Sanitary Sewer Service Stub, Trenched, PVC, 6" - 410 LF; Sanitary Sewer Cleanout - 13 EA; Water Main, Trenched, PVC, 2" - 767 LF; Water Service Pipe, PE, 1" - 30 LF; Water Service Pipe, Corporation, 1" - 10 EA; Water Service Valve and Box, 2" - 1 EA; Water Main Connection No. 1 - 1 EA; Yard Hydrant - 10 EA; Simplex Grinder Pump Station - 1 EA; Pavement, PCC , 7" Thick - 53 SY; Removal of Sidewalk - 25 SY; Sidewalk, PCC, 5" Thick - 25 SY; Pavement Removal - 53 SY; Conventional Seeding, Fertilizing, and Mulching - 1 LS; Mobilization - 1 LS Three Mile Lake Campgrounds - Division 2 - Electrical Improvements - Secondary power distribution system to serve campsites at Three Mile and Mallard Point campgrounds to include 400 A Main Panel Board and Stand Constructed with Pressure Treated Lumber, Direct Embedded with 4 cu. ft. Concrete - 5 EA; (3) 600 MCM Type THWN-2 CU, 4" Conduit - 100 LF; (3) 350 MCM Type USE Al and (1) 1/0 AWG Type USE Al EGC, Trenched - 2,760 LF; (3) 350 MCM Type USE Al and (1) 1/0 AWG Type USE Al EGC, Horizontally Bored in 2.5" HDPE - 120 LF; (3) 4/0 AWG Type USE Al and (1) 1/0 AWG Type USE Al EGC, Trenched - 2,997 LF; (3) 4/0 AWG Type USE Al and (1) 1/0 AWG Type USE Al EGC, Horizontally Bored - 20 LF; #8/3 CU UF-B w/G, Trenched, 185 LF; #10/3 CU UF-B w/G, Trenched, 315 LF; #12/3 CU UF-B w/G, Trenched, 195 LF; Ground Field Utilizing 1/0 AWG Stranded Bare CU, 5 EA; Ground Field Utilizing #6 AWG CU Solid, 5 EA; RV Pedestal (furnished by owner), Direct Embedded with 1 cu. ft. Concrete; 71 EA; Re-Feed Existing Light Poles; 4 EA; Coordinate Terminations at Point of Common Coupling with Utility, 5 EA; Note: the footages above associated with circuits represent the trench or bore footages and do not represent the total circuit or wire footages. Low Bids Division 1: Low: Max Smith Construction $144,280 2nd: Hoffman Communications $153,420 3rd: GM Contracting $157,395 4th: Elite Utility $168,793 5th: Friday Excavation $171,525 6th: 3M Contracting $189,670 7th: J & K Contracting $246,877 Low Bids Division 2: Low: Vicker Drilling $176,000 2nd: Keul Electric $219,649 3rd: Bartlett Electric $238,600 4th: Wiremann Electric $258,730

Bid Results

Playgrounds / Parks / Athletic Fields

$144,280.00

Public - County

Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
35
Bidding Soon
418
All Active Projects
204
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2022

October 31, 2022

img_map_placeholder

To Be Determined, Afton, IA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.