BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction, renovation and addition to a mixed-use development in Dickinson, Texas. Completed plans call for site work for a educational facility; for the construction of a 15,018-square-foot pre-engineered storage facility; pre-engineered storage facility; for the addition of a 4,550-square-foot pre-engineered storage facility; for the renovation of a 10,855-square-foot pre-engineered storage facility; 3,665-square-foot educational facility; 1,445-square-foot educational facility; and 2,400-square-foot educational facility.

The Transportation Center consist of new construction of a 15, 018 SF pre-engineered addition at the service bays and 4,550 SF pre-engineered addition at the administration area along with 10, 855 SF of general renovation. 2. Transportation Center also includes adding new bus parking paving and a fuel canopy with dispensers and above ground storage tanks. 3. Start work on site 12-01-22, Substantially Complete 11-01-23 4. Budget Amount $10M Technology Center 2801 Oak Park Sr., Dickinson, TX 77539 1. The Technology Center consist of 1,445 SF of interior renovation and a pre-engineered 3,665 SF addition that consist of an aluminum walk-way canopy to connect the existing Technology Support to the new addition. Warehouse building for additional cubicles, storage and meeting space. 2. Start Work on site 03-01-23. Substantially Complete 09-01-23 3. Budget Amount $1.7M Agricultural Center 3000 Baker Dr., Dickinson, TX 77539 1. The Ag Science Additions and Renovations consist of 10,885 SF pre-engineered building to house 28 cattle pens. This facility also consists of a 2,400+ SF show arena and wash and scale areas for the cattle. 2. Additional parking and a trail access road connected to a new fire access lane is also included in the scope of work. 3. The existing facility west cattle pen aisles are converted to pig pens by owner, however a new 8' CMU partition with hollow metal doors and frames at each aisle end. Additional fans and heaters are added to provide cooling and heating for the pens re-configured for pigs. 4. Start work on site 12-15-22, Substantially Complete 07-15-23 5. Budget Amount $3.5 M ALTERNATE NO. 1 - Transportation Center Bus Parking Paving. ALTERNATE NO. 2 - Ag Center Angled Parking.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$15,200,000.00

Public - City

Addition, New Construction, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
206
Bidding Soon
4,020
All Active Projects
1,671
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 28, 2022

December 1, 2022

November 1, 2023

img_map_placeholder

2801 Oak Park St, Dickinson, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.