BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Chicago, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the renovation of a fire / police facility; fire / police facility; water / sewer project; road / highway; and road / highway.

ALL Construction Group is soliciting Bids for the following project: PERSHING ROAD WEST BUILDING AND TUNNEL UPGRADES - PHASE 1 The project scope is for work to abandon the utility tunnels and structurally secure the tunnel along the south side of this building and the two adjoining buildings including abatement as required. Work will include isolating structural walls, securing new pathways for utilities, and filling the tunnels with flowable fill. The utility tunnel is approximately 930LF and connects to the two adjoining buildings. Phase 2 will not be included at this time and will be bid as a separate contract at a later date. Bid Package 1: 1.1 Asphalt 1.2 Concrete 1.3 Concrete Restoration 1.4 Demolition 1.5 Electrical 1.6 HVAC 1.7 Fire Protection 1.8 Steam Piping 1.9 Plumbing 1.10 Masonry 1.11 Site Utilities 1.12 SWPP 1.13 Waterproofing The subject site encompasses approximately 450,000 square feet of land and includes three main 6-story warehouse buildings of approximately 600,000 square feet each with underground connecting tunnels and bridge connections. The site is bounded by W. Pershing to the North, S. Wolcott Ave. to the east, and railway tracks to the south, with S. Honore St. and S. Wood St. transecting the site. The MBE / WBE Contract goals for the Project are 26% MBE and/or WBE in aggregate. C. EEO Participation included in bid for on-site labor Minority Journey worker Project employment (50% Goal): ______% included in bid Minority Laborer Project employment (30% Goal): ______% included in bid Minority Apprentice Project Employment (20% Goal): ______% included in bid Female Journey worker Project employment (1% Goal): ______% included in bid Female Laborer Project employment (0% Goal): ______% included in bid Female Minority Apprentice Project Employment (1% Goal): ______% included in bid Projected Project Total On-Site Work Hours _________ D. City Residency percentage (50% Goal): ______% included in bid E. Community Hire percentage (7.5% Goal): ______% included in bid

Post-Bid

Fire / Police

Public - City

Paving, Renovation, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
94
Bidding Soon
1,824
All Active Projects
799
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2022

November 4, 2022

img_map_placeholder

1869 W Pershing Rd, Chicago, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.