Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and renovation of a mixed-use development in Chicago, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the renovation of a fire / police facility; fire / police facility; water / sewer project; road / highway; and road / highway.
ALL Construction Group is soliciting Bids for the following project: PERSHING ROAD WEST BUILDING AND TUNNEL UPGRADES - PHASE 1 The project scope is for work to abandon the utility tunnels and structurally secure the tunnel along the south side of this building and the two adjoining buildings including abatement as required. Work will include isolating structural walls, securing new pathways for utilities, and filling the tunnels with flowable fill. The utility tunnel is approximately 930LF and connects to the two adjoining buildings. Phase 2 will not be included at this time and will be bid as a separate contract at a later date. Bid Package 1: 1.1 Asphalt 1.2 Concrete 1.3 Concrete Restoration 1.4 Demolition 1.5 Electrical 1.6 HVAC 1.7 Fire Protection 1.8 Steam Piping 1.9 Plumbing 1.10 Masonry 1.11 Site Utilities 1.12 SWPP 1.13 Waterproofing The subject site encompasses approximately 450,000 square feet of land and includes three main 6-story warehouse buildings of approximately 600,000 square feet each with underground connecting tunnels and bridge connections. The site is bounded by W. Pershing to the North, S. Wolcott Ave. to the east, and railway tracks to the south, with S. Honore St. and S. Wood St. transecting the site. The MBE / WBE Contract goals for the Project are 26% MBE and/or WBE in aggregate. C. EEO Participation included in bid for on-site labor Minority Journey worker Project employment (50% Goal): ______% included in bid Minority Laborer Project employment (30% Goal): ______% included in bid Minority Apprentice Project Employment (20% Goal): ______% included in bid Female Journey worker Project employment (1% Goal): ______% included in bid Female Laborer Project employment (0% Goal): ______% included in bid Female Minority Apprentice Project Employment (1% Goal): ______% included in bid Projected Project Total On-Site Work Hours _________ D. City Residency percentage (50% Goal): ______% included in bid E. Community Hire percentage (7.5% Goal): ______% included in bid
Post-Bid
Fire / Police
Public - City
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 4, 2022
November 4, 2022
1869 W Pershing Rd, Chicago, IL
Related To This Project
Chicago, IL
--
Chicago, IL
Bid Date: Oct 05 2022
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Aug 26 2022
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.