BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Bolivia, North Carolina. Completed plans call for the construction of a data center facility; and for site work for a data center facility.

New Data Center Project Questions submitted to dbair@bcswan.net (Reference RFP # in subject line) 9/26/2022 Provide Response to Questions 9/27/2022 Brunswick County Schools reserves the unqualified right to reject any and all offers when such rejection is deemed to be in the best interest of Brunswick County Schools. This project is an integrated turnkey data center solution and shall include the following: o Purchase of Cisco network, security and server equipment for the Data Center. Scope of project is to upgrade all Cisco equipment and to purchase software and hardware support for five years of coverage. Full purchase list will be provided at the Pre-Bid Meeting. Engineering professional services for configuration and installation assistance of the Cisco equipment will be negotiated separately once a solution provider is awarded the project. o 20KVA UPS 480/208/120 with isolation transformer, 20KVA redundant module, external maintenance bypass with SKRU, and a communication card. UPS be manufactured by the same manufacture as the rack solution and HVAC to maintain match and finish. o 3 rack integrated solution with supply air plenum for under the cabinets and return air plenum for top of the cabinets. All plenums must be manufactured by the same manufacture as the server cabinets, UPS and HVAC and have the same fit and finish. o Quantity (2) 5 Ton downflow (No Exceptions) 460 V precision cooling units with controls that can be networked together, 460V high ambient, and coated condensers. HVAC unit shall have integrated electrical panel and fire suppression. HVAC Units shall be manufactured by the same manufacture as UPS, Server Racks and under the rack supply plenum and top of the rack return plenum to maintain same fit and finish. o Quantity (6) 3 phase rack mount PDUs with L21-30 input with C13-C19 Combination. All PDUs must be metered and controlled at a receptacle level. o SNMP Monitoring software. o Integrated fire suppression. o Quantity (1) 150 KW 480 Volt Generator with 72 hour base tank LSI breaker, sound aluminum enclosure 75 DBA at 23', tropicalized coated alternator, Communications Card and Matching 3 pole standard transition ATS, NFPA 110 system in a NEMA 1 Enclosure.

Bid Results

Data Centers

$2,207,425.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
36
Bidding Soon
403
All Active Projects
176
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2022

December 5, 2022

img_map_placeholder

1109 Old Ocean Hwy, Bolivia, NC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.