BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a parking garage in Santa Cruz, California. Completed plans call for site work for a parking garage; and for paving for a parking garage.

The Public Works Department of the City of Santa Cruz is soliciting proposals from qualified firms with expertise in municipal parking garage restoration consultation services for the assessment of two parking structures in the City of Santa Cruz. The project involves the assessment of the structures through visual and materials testing, documentation of the location and extent of deterioration and evaluating the impacts of the noted deterioration on the structural capacity, long-term durability and service life of each facility, providing an evaluation of structural and durability related repairs that may be required, and to develop a 5-year Capital Improvement and Protection Program. This Request for Proposals (RFP) is being made available to entities who are qualified to perform the entire scope of services as described in this RFP. The Soquel/Front Garage, located at the corner of Soquel Avenue and Front Street is a four-level structure which provides parking for approximately 400 vehicles. The ground level of the structure includes an electric vehicle charging station, public restrooms and four commercial spaces, parking office, collections room, and a maintenance and storage area. The structure was built in the early 2000's with a combination of precast and cast-in-place concrete panels, post-tensioned reinforced concrete beams and slabs, and cast-in-place concrete columns. Repairs were made to roofing systems in 2007 and 2017, and improvements were made to the restroom facilities in 2010. The Locust Garage, located at the corner of Cedar St. and Locust St. is a five-level structure including a basement level, which provides parking for approximately 400 vehicles. The ground level of the structure includes public restrooms, four commercial spaces, the City of Santa Cruz Parking Citation Office, and Parking Operations Office. City parking enforcement vehicles are stored in a portion of the basement. The structure was built in the early 1990's with a combination of pre-cast and cast-in-place concrete components with a brick facade. In 2008 an accessible bathroom was added on the ground floor, and in 2013 improvements were made to existing public restroom facilities

Post-Bid

Parking Garage

$1,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
66
Bidding Soon
1,296
All Active Projects
541
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2022

November 9, 2022

img_map_placeholder

1014 Cedar St, Santa Cruz, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.