BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Union, California. Completed plans call for the renovation of a water / sewer project.

As of December 01st, 2022, project has not been awarded yet. No timeline of award was established. For furnishing all labor, materials, equipment, and services for the construction of improvements designated as: Pump Stations Chemical System Improvements Project The project consists of mechanical, electrical, instrumentation, and structural improvements to the Newark Pump Station (NPS) and Irvington Pump Station (IPS). More specifically, the work includes, but is not limited to, the following work elements: o Demolition of existing vapor phase odor control system and roof-mounted exhaust fan at NPS. o Installation of new odor control engineered media biofilter serving NPS odor sources along with remote odor control exhaust fan with variable frequency drive (VFD) unit and two (2) stack fans and stack at NPS. o Replacement of existing supply air fan with new supply air fan at NPS. o Replacement of chemical bulk storage tank along with level instrumentation and controls at NPS. o Replacement of the two (2) chemical metering pumps along with new VFDs at NPS. o Replacement of chemical dosing piping with new double containment piping with leak detection in existing utility trench from metering pumps to intermediate level of the dry well side of the pump station building at NPS. o Rehabilitation and recoating the chemical bulk storage containment area at NPS. o Providing of stair tower access to pump station roof and providing guard railing at existing roof parapet at NPS. o Rebalancing of supply air and exhaust air flow rates from the existing pump station facility at NPS. o Cathodic protection repair of raw sewage (RS) pipe joint at NPS. o Miscellaneous electrical and instrumentation improvements at NPS. o Demolition of existing odor control chemical packed tower scrubber system at IPS. o Providing temporary odor control system at IPS. o Demolition of existing concrete equipment pit currently housing the odor control system and chemical dosing metering pumps at IPS. o Installation of new odor control engineered media biofilter serving IPS odor sources along with new odor control exhaust fan with VFD and two (2) stack fans and stack at IPS. o Replacement of chemical dosing piping with new double containment piping with leak detection placed in new utility trench routed from chemical bulk storage containment area to existing valve vault at IPS. o Relocation of the two (2) existing chemical metering pumps to the existing chemical bulk storage containment area to be expanded and provide with new VFDs at IPS. o Rehabilitation and recoating the chemical bulk storage containment area at IPS. o Rehabilitation of corroded section of existing RS piping with welded steel patch at location of existing unused ferrous chloride injection point at IPS. o Installation of new RS bypass piping including piping, supports, platform access, cathodic protection, flow meter, throttling valve, and accessories to allow controlled bypass around the existing surge tower to the existing Equalization Basins at IPS. o Repair and rehabilitation of corroded components located in the existing valve vault at IPS. o Providing of bridge access to pump station roof from new biofilter structure and providing guard railing at existing roof parapet at IPS. o Rebalancing of supply air and exhaust air flow rates from the existing pump station facility at IPS. o Replacement of eleven gate valves and actuators at the raw sewage pumps 1 through 4 inlet and discharge piping along with the downstream header system with knife gate valves and actuators at IPS. Refurbishing of four existing gate vales at pumps 5 and 6. o Installation of new Training Facility components including interconnecting piping, concrete box, valves, and manholes at IPS. o Miscellaneous electrical and instrumentation improvements at IPS. The successful bidder will have six hundred and fifty - five (655) calendar days to complete the Project from the Notice to Proceed. Under California Laws and Regulations, the District shall inform all prime contractors of public works, to the extent feasible of relevant public work requirements as listed in Section 00010 of the Contract Documents. All bidders shall consider and incorporate measures to ensure compliance with all applicable state and county health orders, including but not limited to Alameda County Health Order No. 20 14a, as may be updated from time to time (County Health Order), and the Construction Project Safety Protocols in Appendix B to the County Health Order. Among other things, compliance shall include but is not limited to the designation of a site-specific COVID-19 officer or supervisor, daily screening protocols, the implementation of social distancing, the provision of personal protective equipment (PPE) and requirement to wear face coverings, the implementation of cleaning and sanitizing requirements, and posting of signage and notices. For Large Construction Projects, compliance also includes but is not limited to preparation of a new or updated Site-Specific Health and Safety Plan and designation of a site-specific COVID 19 Third-Party Jobsite Safety Accountability Supervisor. Pre-Qualification for Bidders: Not Required License Type Required: Valid Class A Liquidated Damages: $2,000.00 Per Calendar Day Bid Bond Percentage: 10% Bidders may pay for plans and specs by sending a check made out to Union Sanitary District, 5072 Benson Road, Union City, California 94587, or by going to our website for payment by VISA or MASTERCARD credit card. All bidders submitting a bid must purchase and receive a paper copy of the Project Manual of Pump Stations Chemical System Improvements Project, Project No. 800-550 from the District prior to the bid opening date. All submitted bids must be on bid forms included in the purchased paper copy of the Project Manual or subsequent addenda. A bid submitted to the District by a bidder who has not purchased and received a paper copy of the Project Manual of Pump Stations Chemical System Improvements Project, Project No. 800-550, or submitted on bid forms not included in the purchased paper copy of the Project Manual or subsequent addenda shall be considered non-responsive and shall be rejected by the District. Each bid must conform and be responsive to the invitation, the Plans and Specifications, and all documents comprising the Contract Documents. Each bid shall be presented under sealed cover and shall be accompanied by a certified check or bidder's bond, made payable to the District, in an amount not less than ten percent (10%) of the bid. The said check or bidder's bond shall be given as a guarantee that the successful bidder will execute the contract in conformity with the form of agreement contained within the contract documents, and will furnish bonds and insurance policies as specified within ten (10) days after notification of the award of the Contract to the successful bidder. Cost for work described in each addenda issued during the time of bidding shall be included in the Bid and the addenda shall become a part of the Contract documents. Bidders shall develop and submit bids at their own expense. The District will not reimburse any costs associated with the development and submittal of any and all Bids. The District reserves the sole right to reject any and all bids and to waive any informality in a bid. No bidder may withdraw its bid for a period of ninety (90) days after the date set for the opening thereof. At the successful Contractor's option, securities may be substituted for the required retention, in accordance with the provisions of Section 22300 of the State of California Public Contract Code. In accordance with the provisions of California Public Contract Code Section 3300, the District has determined that the Contractor shall possess, as a minimum, a valid Class A License. In accordance with the provisions of California Business and Professions Code Section 7028.15, a bid submitted to the District by a Contractor who is not licensed in accordance with Chapter 9 of the California Business and Professions Code shall be considered non-responsive and shall be rejected by the District. Questions concerning this project should be directed to: Union Sanitary District Attn: Thomas Lam 5072 Benson Road Union City, CA 94587 Phone: (510) 477-7609

Bid Results

Water / Sewer

$10,779,000.00

Public - City

Renovation

137

27

9

14

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
361
Active Projects
174
Bidding Soon
3,223
All Active Projects
1,332
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 20, 2022

December 21, 2022

img_map_placeholder

Multiple Locations, Union, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.