Site work and paving for a road / highway in Baldwin, Wisconsin. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of October 3, 2024, the project is in the design phase. A civil engineer has been selected. Construction is scheduled for FY 2027 but work could begin as early as FY2026 if funding becomes available. *The closed solicitation has been included below for reference: Transportation Region/Bureau: Northwest Region Solicitation ID: NW-01 Anticipated Construction Cost: $8,000,000-$8,999,999 Route : USH 063N County : 55 - St Croix County Limit : Ush 12 W to Polk County Line The pavement and structures need treatment to extend their service lives and safety will be improved. Perpetuation project to resurface approximately 21.1 miles of USH 63 from USH 12 W to Polk County Line, Towns of Hammond, Baldwin, Emerald, Erin Prairie, Cylon, and Forest, in St. Croix County. Work includes a 2" Mill (25' wide) of the existing asphalt pavement and a 2" HMA Overlay (except at intersections, turn lanes, and passing lanes (mill and relay entire width). From CTH E to approximately 700 feet South of STH 64, mill entire width and widen paved shoulders to 5' and add shoulder rumble strips. Structure work includes replacing C-55-1358 with a precast concrete pipe, sealing the construction joints on C-55-1376, sealing the west construction joint on C-55-1356, adding rip rap to both abutments of B-55-0217, concrete surface repair to the deck soffit of B-55-0102, and joint replacement and concrete surface repair of the deck soffit on B-55-0242. The project work also includes a Through Route Activated Warning System (TRAWS) at the CTH G intersection, spot beam guard replacement, minor culvert work (cleaning, lining, replacements, relaying, scour repair), ditch cleaning, roadside clearing, and pavement marking. The contract price will be based on an estimate of the selected consultants actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Information on the report may be found electronically. Advertised Fixed Fee %: 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultants estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - RFP - Engineering - Baldwin - Clear Lake *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Design
Roads / Highways
$9,000,000.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2026
US-63, Baldwin, WI
Related To This Project
Baldwin, WI
Bid Date: Sep 22 2022
Baldwin, WI
Bid Date: Nov 08 2022
Baldwin, WI
Bid Date: Mar 24 2022
Baldwin, WI
Bid Date: Mar 23 2021
Baldwin, WI
Bid Date: Aug 09 2022
Baldwin, WI
Bid Date: Apr 02 2020
Baldwin, WI
Bid Date: Feb 02 2023
Lake Geneva, WI
Bid Date: Oct 13 2022
Milwaukee, WI
Bid Date: Oct 26 2022
Waukesha, WI
Bid Date: Oct 20 2022
La Crosse, WI
Bid Date: Nov 08 2022
Milwaukee, WI
--
Hudson, WI
Bid Date: Oct 13 2022
Oshkosh, WI
Bid Date: Oct 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.