EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 31, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Northport, Alabama. Completed plans call for site work for a water / sewer project.

For the furnishing of all labor and material (where required) and equipment for performing a public works project according to the plans, details, specifications and Contract Documents. Award of the contract will be made within forty-five (45) calendar days from the date of the bid opening. The Project shall be known as Levee Repair Project and the general character of said public works project shall consist of the following: This project shall include repairing approximately 300' of the northern portion of the levee. The approximate quantities of said Project are as follows: 300 linear feet levee repair Special instructions are as follows: supplemental information is available in the bid documents available at Northport City Hall. The City will furnish the following: N/A Time of Construction: From the date stated in the Notice to Proceed, the Project time of construction is 45 consecutive calendar days. If prequalification of bidders is indicated to be required by the preceding sentence, then written prequalification information is available for review at the same office where Bid Documents are available. The attention of all bidders is called to the provisions of State law governing "general Contractors," as set forth in Ala. Code 34-8-1, et seq. (1975), and rules and regulations promulgated pursuant thereto. The City may not enter into a contract with a non-resident corporation or entity which is not qualified under State law to do business in the State of Alabama. All bidders shall possess all other licenses and/or permits required by applicable law, rule or regulation for the performance of the work. All bidders must submit with their proposal, Contractor's license number and a copy of the license. State law, Ala. Code 34-8-8(b), requires all bids to be rejected which do not contain the General Contractor's current license number. The City reserves the right to reject all bids and/or reject and rebid the Project should it determine the same is in the best interest of the City.

Award

Water / Sewer

$45,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Post-Tensioned Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Termite Control, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Special Foundations
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Planting, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Lifts, Material Storage, Bulk Material Storage
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
46
Bidding Soon
547
All Active Projects
280
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2022

October 24, 2022

img_map_placeholder

Multiple Locations, Northport, AL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Levee Repair Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.