BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an elderly care / assisted living facility in Farmington, New York. Completed plans call for the renovation of a elderly care / assisted living facility.

Martz IRA Basement Painting The Finger Lakes DDSO is soliciting bids for Basement Painting at our Martz IRA. This is a NYS public works project and prevailing wages must be paid. Location: Martz IRA, 5700 Martz Rd, Farmington, NY 14425 Contract term: 30 days after completion of project SCOPE OF WORK includes, but is not necessarily limited to the following: Complete Interior painting of residence basement; Walls, Ceilings, Doors and Trim, etc. 1. Price quote shall include all materials (paint, stain, necessary tools and accessories) and labor. 2. The first coat on the cinder block walls will be UGL Original Drylock low VOC sealer applied per manufacturers directions. 3. Paint, stain and other finishes must be a SHERWIN WILLIAMS product. The color slate violet sw9155 will be used on the cinderblock walls, white on the drywall walls and ceiling, and on the rocks sw7671 will be used for the trim and doors. 4. House accessibility to be determined by House Director. 5. Remove furniture as required and return to place when job is complete. 6. Disconnect/Remove appliances as required and return/re-connect when job is complete. 7. Removal all pictures, outlet and switch covers and return to place when job is complete. 8. Remove all electronics if needed and return/re-connect to place when job is complete. 9. Imperfections (eg: Holes gouges, and dings) on wall and ceiling surfaces shall be filled with a proper spackling compound. Then sanded smooth and primed before a top coat to prevent flashing. 10. Clean and prepare surfaces to be painted per the manufacturer's written instructions for each substrate condition and as specified. The price is to include wall paper and sizing removal and spackling of all damaged wall surfaces prior to painting. All surfaces must be sanded after patching to match existing surface to ensure invisible repairs then primed before applying topcoat. 11. Paint used in the basement shall include a mold inhibitor. 12. Ceiling paint shall be a flat finish, except in Bathrooms/Kitchens where a semi-gloss finish should be used. 13. Paint used on walls and trim must be a semi-gloss finish. 14. A clear satin low VOC coating to be applied to all-Natural Wood trim and doors if needed. 15. Any stains on ceilings and walls shall be primes, with a stain killing primer to prevent bleed-through of topcoat. 16. All surfaces shall have two (2) coats of paint minimum; three (3) or more if necessary, for complete coverage, same for varnish's if applicable. 17. Apply paints and stains by brush and roller only, per the manufacturer's written instructions. Use primer as recommended by manufacturer. 18. Use drop cloths to cover stationary furniture, flooring, appliances, etc. 19. See attached floor plan for work that needs to be addressed on a room-to-room basis. 20. Sprinkler heads, fire alarm pull stations, smoke detectors, and heat detectors must be free of any paint when the job is complete. 21. Remove and dispose of any empty cans, rags, rubbish, masking and other rubbish materials at the end of each work day. 22. Clean glass and paint spattered surfaces by scraping and washing.

Post-Bid

Elderly Care / Assisted Living

$160,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
57
Bidding Soon
1,109
All Active Projects
593
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2022

November 11, 2022

img_map_placeholder

5700 Martz Rd, Farmington, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.