EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 7, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Bellwood, Illinois. Completed plans call for the renovation of a educational facility.

Project Location: 225 46th Avenue, Bellwood IL and 338 E. Whitehall, Northlake, IL 60164 This project includes replacement of mechanical units and associated general trades work at Jefferson and Whittier Primary Schools as outlined in the documents. Prospective bidders may choose to purchase hard copies of the Bidding Documents from American Reprographics Company at their own expense. Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable to Board of Education, Berkeley School District #87, in an amount equal to ten percent (10%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. The successful bidder is required to pay the general prevailing wage for work as ascertained by the Illinois Department of Labor, and shall submit certified payroll records, in compliance with the Prevailing Wage Act (820 ILCS 130) and shall comply with all applicable Illinois statutory requirements regarding labor, including Equal Employment Opportunity laws. The successful bidder is required to provide insurance, and performance and labor and material payment bonds in the forms and amounts required by the bid documents. Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. If visiting during school hours visitors shall report to the school office and identify themselves upon arrival at the site. Schedule an appointment with the District Facilities Department (708-449-3355) in advance. Days and times may be limited to avoid disruption of school operations.

Award

Educational

$3,554,000.00

Public - City

Renovation

30

16

56

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Demonstration and Training, Commissioning, General Commissioning Requirements
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Ceilings, Acoustical Ceilings
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units, Unit Ventilators, Convectors, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Low-Voltage Controllers, Variable-Frequency Motor Controllers, Facility Electrical Power Generating and Storing Equipment, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
281
Active Projects
162
Bidding Soon
2,180
All Active Projects
1,091
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2022

June 9, 2023

img_map_placeholder

Multiple Locations, Bellwood, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Jefferson and Whitter Primary Schools HVAC Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.