Site work and renovation of a water / sewer project in Hazleton, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Clarification Deadline 10/26/2022 2:00 PM In general, the Work includes the removal and replacement of four (4) raw water pumps and associated piping/appurtenances at the HCA Water Treatment Plant. Bids will be accepted for replacement of 4 raw water pumps and all associated piping/appurtenances. A certified check or bid bond drawn to the order of the Hazleton City Authority - Water Department in an amount equal to ten percent (10%) of the bid must be submitted with each proposal as bid security and received at the Authority's Office with all other required bid documents prior to the Bid Opening. Bidders shall comply with all procedures and requirements of the Contract Documents. The Hazleton City Authority - Water Department encourages DBEs, including MBEs and WBEs, to submit a bid proposal. All Prime and sub-contractors shall make the required good faith efforts when subcontracting and shall provide all documents to substantiate their search prior to award. Prior to the award of any Contract, the successful bidder shall furnish to the Owner Certificates of Insurance, Performance Bond, Labor and Material Payment Bond, American Steel certifications, DBE/WBE Compliance Documents, and any other items as required by the Contract Documents. A satisfactory surety shall execute all bonds. Bidders on all work will be required to comply with the Pennsylvania Human Relations Act No. 222. The Commonwealth of Pennsylvania, Department of Labor and Industry and Federal Prevailing Minimum Davis Bacon Wage Determinations, which are included as, part of the Contract Documents. All required wage rates for this project and shall govern all work under this Contract. The Hazleton City Authority - Water Department is an Equal Employment Opportunity Employer. Except as otherwise provided by law, no Bidder may withdraw a bid within sixty (60) consecutive calendar days after the actual date of the bid opening or one hundred twenty (120) consecutive calendar days if the award is delayed by a required approval of another governmental agency, the sale of bonds, or the award of a grant or grants. The Hazleton City Authority is a Pennsylvania Municipal Authority and subject to the Pennsylvania Right to Know Act. All prospective bidders shall execute a swaiver of the Application of the Uniform Electronic Transactions Act, 73 P.S. 2260.101 et seq., and the Electronic Signatures in Global and National Commerce Act, 15 U.S.C.S. 7001 et seq. The Hazleton City Authority - Water Department hereby reserves the right in its discretion, which is understood and agreed to by all bidders, to reject any and all bids submitted, and also reserves the right to waive any irregularities, omissions, mistakes, or informality in the Bidding Process. The Bid, if awarded, will be awarded at the sole discretion of the Authority at the lowest total cost to the best responsive and responsible Bidder based on a final review work to be awarded as selected by the Owner. All bidders must show adequate knowledge, experience and past projects in similar size and complexity. The Work will be substantially completed within 300 days after the date when the Contract times commences to run as approved in Paragraph 2.03 of the General Conditions and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 330 days 1. Raw Water Pump Replacement Project (Contract A - General/Mechanical): Demolish and replace Raw Water Pumps Nos. 1-4 and associated discharge piping, concrete pump pads, and all other appurtenances to make an operational system. Project is located at HCA Water Filtration Plant in Hazleton City, Luzerne County. 2. Raw Water Pump Replacement Project (Contract B - Electrical): Installation of variable frequency drives and electrical/SCADA connections for new Raw Water Pump Nos. 1-4. Project is located at HCA Water Filtration Plant in Hazleton City, Luzerne County.

Bid Results

Water / Sewer

$97,950.00

Public - City

Renovation, Site Work

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, High-Performance Coatings
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Dewatering
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
124
Bidding Soon
1,777
All Active Projects
813
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

December 1, 2022

img_map_placeholder

400 E Arthur Gardner Pkwy, Hazleton, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

HCA Operational Upgrades Part B Raw Water Pump Replacement Project - General/Mechanical and Electrical

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.