BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2022 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Kennesaw, Georgia. Completed plans call for the renovation of a educational facility.

Work of this section includes installation of a two-part epoxy-based moisture mitigation system at all areas shown to receive LVT flooring. Definitions: The two-part epoxy-based moisture mitigation system consists of an epoxy resin and a hardener. The product is shipped in separate canisters, which are mixed for installation. This project consists of selective demolition and replacement of floor coverings. Questions Due Date: Oct 4th 2022, 3:00 PM EDT

Under Construction

Educational

$1,290,810.00

Public - County

Renovation

5

11

20

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
319
Active Projects
208
Bidding Soon
2,260
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2022

November 11, 2022

Project location map

700 Old Mountain Rd NW, Kennesaw, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.