Site work for a clubhouse / community center in Oak Island, North Carolina. Completed plans call for site work for a clubhouse / community center.

The work will consist of installing 470 square yards of permeable pavement, 1,165 square feet of stormwater management underground infiltration system, stormwater pump station with electrical control panel, associated storm drainage system, ABC stone and concrete pavement replacement, and dune vegetation replacement within Town right-of-way and Town parcels located near the Building 801. Any questions related to this bid may be addressed during the pre-bid meeting or directed in writing to the attention of Marc Horstman at mhorstman@wkdickson.com Bids must be submitted on the complete project and must be enclosed in a sealed envelope, addressed to Marc Horstman, Project Manager, WK Dickson & Co., Inc., 720 Corporate Center Drive, Raleigh, NC 27607, on behalf of Town of Oak Island. Outside of the envelope must be marked Bid for Oak Island Building 801 Flooding Improvements. Envelope must also bear, on the outside, the name of the bidder, bidders address, and bidders license number. All bids must be made on blank forms provided and included in the bound document or as provided by Addendum prior to bid. Project Location: Oak Island, NC For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Bid Results

Clubhouse / Community Centers

$466,569.00

Public - City

Site Work

18

15

17

7

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Administrative Requirements, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Waterway Construction and Equipment, Waterway Scour Protection
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
21
Bidding Soon
327
All Active Projects
131
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2022

December 12, 2022

img_map_placeholder

801 Ocean Dr, Oak Island, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.