Site work, new construction and renovation of a civil project in Arlington, Texas. Completed plans call for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of January 9, 2023, the project has been awarded. Construction is expected to commence March 13, 2023, however, a timeline for completion has not been confirmed. The project scope includes, but is not limited to, the following major work items: Rehabilitation of 3 Clariflocculators including replacement of truss arms, scrapers, center cage, motor and new VFDs; Rehabilitation of 24 dual media filters including replacement of underdrains, media, wash troughs, and structural work; West Filter Gallery piping and valve replacement including replacement of filter gallery piping and electric actuated filter valves for four filters including new 24-inch backwash flow control valve and flow meter; East Filter Gallery piping rehab including filter pipe repairs, new filter effluent valve actuators, new 24-inch backwash flow control valve and flow meter; Plant Control System (PCS) upgrades including replacement of six filter RTU controllers with Modicon PLCs, signal relocation, filter console modifications, MOSCAD RTU replacement, fiber optic network reconfiguration and new patch panels, replacement of network switches, and new filter UPS; Relocation of about 400 linear feet of 20-inch pipeline (Treated water Fort Worth backup supply); Construction of new Chlorine Contact Basin including civil site, excavation, shoring, deep foundation, concrete, misc. metals, piping, valves, mixers, electrical, instrumentation, and SCADA modifications; Replacement of caustic feed pumps; Construction of cast-in-place concrete chemical containment trenches and installation of new chemical piping at various locations throughout the plant site; and Replacement of motorized entrance gates at two locations. Estimate: $25-$30M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project scope includes, but is not limited to, the following major work items: Rehabilitation of 3 Clariflocculators including replacement of truss arms, scrapers, center cage, motor and new VFDs; Rehabilitation of 24 dual media filters including replacement of underdrains, media, wash troughs, and structural work; West Filter Gallery piping and valve replacement including replacement of filter gallery piping and electric actuated filter valves for four filters including new 24-inch backwash flow control valve and flow meter; - Last Day to Submit Questions: October 13, 2022 at 2:00 PM *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$30,000,000.00

Public - State/Provincial

New Construction, Renovation, Site Work

227

41

25

4

Subscribe For Documents

88 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
410
Active Projects
214
Bidding Soon
3,995
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.