Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 7, 2022 at 8:00 PM
Updated February 10, 2024
Site work and paving for a mixed-use development in Fort Wayne, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.
The Bidder shall furnish all labor, insurance, equipment, materials and power for the complete performance of this project as follows: Improve Winchester Road from Shamrock Road to Mayflower Road by adding new concrete sidewalk on the west side of the road. Improvements will also include: updating residential drive approaches and driveway stormwater pipe, ADA ramps, and reprofiling ditch to improve drainage all in accordance with the Bidding Documents and Drawing No. ST0340S as prepared by Transportation Engineering for the City of Fort Wayne, Indiana. No bid will be accepted from, or contract awarded to any person, firm, or corporation that is in arrears to the City, upon any debt or contract, or, who has failed to execute, in whole or in part in a satisfactory manner, any contract with the City; or, who is a defaulter as to surety or otherwise, upon any obligation to the City. No bid may be withdrawn after the scheduled time for receipt of bids for at least ninety (90) days to allow review of bids before announcing award of contract. The successful bidder may be required to furnish a satisfactory Labor and Material Payment Bond and Performance Bond each in the amount no less than one hundred (100%) percent of the contract price. The Board reserves the right to reject any and all bids for failure to comply with applicable laws and/or with the Instructions to Bidders. The Board also reserves the right to waive any defect in any bid. EBE GOALS - The Citys goal for qualified Emerging Business Enterprise (E.B.E), as subcontractors on this project is ten percent (10%) of the contract amount.
Award
Sidewalks / Parking Lot
$255,225.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2022
October 31, 2022
Winchester Rd, Fort Wayne, IN
Related To This Project
Fort Wayne, IN
Bid Date: Sep 21 2022
Fort Wayne, IN
Bid Date: Sep 07 2022
Fort Wayne, IN
Bid Date: Oct 06 2022
Fort Wayne, IN
Bid Date: Oct 06 2022
Fort Wayne, IN
Bid Date: Sep 30 2022
Fort Wayne, IN
Bid Date: Oct 25 2022
Fort Wayne, IN
Bid Date: Sep 28 2022
Fort Wayne, IN
Bid Date: Sep 15 2022
Fort Wayne, IN
Bid Date: Sep 29 2022
Fort Wayne, IN
Bid Date: Sep 29 2022
Fort Wayne, IN
Bid Date: Sep 29 2022
Fort Wayne, IN
Bid Date: Sep 29 2022
Fort Wayne, IN
Bid Date: Sep 29 2022
Fort Wayne, IN
--
Fort Wayne, IN
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
