Published April 5, 2023 at 8:00 PM

Updated October 1, 2024

Site work, outdoor lighting and renovation of a mixed-use development in Boston, Massachusetts. Completed plans call for the renovation of a transportation facility; for site work for a transportation facility; and for outdoor lighting for a transportation facility.

The work consists of the following major activities within the Tower 1 interlocking area: (1) the replacement of existing trackwork, (2) the construction of a foundation for a new central instrument house, (3) the upgrading of the existing relay based signal system with a microprocessor based signal system, (4) the replacement of the existing back-up power generator, (5) new lighting and replacement of the existing floodlights, and (6) additions to the communications and security systems, and (7) the replacement of existing trackwork and associated signal infrastructure within the Cove interlocking area.. Each prospective bidder proposing to bid on this project must be prequalified in accordance with the Authority's "Procedures Governing Classification and Rating of Prospective Bidders." Applications for prequalification for this Project will be accepted by the Authority up to the bid opening date. Contractors should allow for ample time for the Authority to evaluate and respond to the Prequalification Application prior to the bid opening date. Only contractors prequalified by the bid opening date will be considered eligible. Bidders' attention is directed to Appendix 1, Notice of Requirement for Affirmative Action to Insure Equal Employment Opportunity; and to Appendix 2, Supplemental Equal Employment Opportunity, Anti-Discrimination, and Affirmative Action Program in the specifications. In addition, pursuant to the requirements of Appendix 3, Disadvantaged Business Enterprise (DBE) Participation Provision, Bidders must submit an assurance with their Bids that they will make sufficient and reasonable efforts to meet the stated DBE goal of 0 percent. Bidders will affirmatively ensure that in regard to any contract entered into pursuant to this solicitation, minority and female construction contractors will be afforded full opportunity to submit Bids and will not be discriminated against on the grounds of race, color, religion, sex, age, or national origin in consideration for an award. Bidders will be required to comply with Federal Equal Employment Opportunity Regulations and the President's Executive Order No. 11246 and any amendments or supplements thereto. Bidders will also be required to comply with the Governor's Executive Order No. 481, prohibiting the use of undocumented workers on State Contracts and any amendments and supplements thereto. All questions during the bid phase should be directed to the MBTA Project Manager in writing or emailed to the contact information above. Questions are to be submitted no later than ten (10) days prior to the date set forth for the opening of the bids. Bidders will be required to certify as part of their bids that they are able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work. This Contract is subject to Federal wage and hourly laws and minimum State wage rates as well as all other applicable labor laws. Bidders are advised that the "Buy America" provisions of the Surface Transportation Assistance Act of 1982 (Pub. L97-424) as amended, apply to any Contract, procurement or agreement which results from this solicitation. Bid Guaranty shall consist of a bid deposit in the amount of five (5) percent of the value of the bid, in the form of a bid bond, cash, certified check, treasurer's or cashier's check. The successful Bidder shall be required to furnish a Performance Bond and a Labor and Materials Payment Bond each for the full amount of the Contract price. The Authority reserves the right to reject any or all Bids, to waive informalities, to advertise for new Bids or proceed to do the work otherwise, as may be deemed to be in the best interests of the Authority.

Award

Transportation Terminals

$98,613,978.00

Public - State/Provincial

Outdoor Lighting, Renovation, Site Work

497

31

58

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Site Maintenance, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Site Remediation, Contaminated Site Material Removal, Underground Storage Tank Removal, Facility Remediation, Transportation and Disposal of Hazardous Materials, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers, Canopies, Other Specialties, Pest Control Devices, Scales
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment, Commercial Equipment, Office Equipment, Computers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating, Chairs, Residential Furniture, Beds, Multiple Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Enclosed Bus Assemblies, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Engine Generators, Battery Equipment, Batteries, Power Filters and Conditioners, Capacitors, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Grounding and Bonding for Communications Systems, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Screening Devices, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Rail Tracks, Track Rails, Special Trackwork, Transportation Construction and Equipment
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Hooks, Manufacturing Equipment, Dies and Molds, Molds, Assembly and Testing Equipment, Mobile Plant Equipment, Trucks, Tank Trucks
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
340
Active Projects
175
Bidding Soon
2,542
All Active Projects
1,157
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2022

January 19, 2023

img_map_placeholder

Atlantic Ave & Kneeland St, Boston, MA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

The South Station Tower 1 Interlocking Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.