Renovation of a mixed-use development in Birmingham, Alabama. Completed plans call for the renovation of a 1,400-square-foot medical facility; and educational facility.

Pre-qualification submittals will be received by the Owner's Representative/Project Manager, Jeff Orr on behalf of Office of the Chief Facilities Officer, UAB Medicine, University of Alabama at Birmingham, and the University of Alabama Board of Trustees at UAB Hospital Planning, 2020 University Blvd., Birmingham, AL 35249 The original and two (2) flash drives with duplicates of submittals are required for pre-qualification approval; however, email transmission copies may be transmitted to the UAB Project Manager at jeorr@uabmc.edu and cc'd to sheywood@ghafari.com and mfreeman@ghafari.com to expedite the review process with a hard-copy of the submittal and two flash drives to be delivered within 24 hours.Spain Wallace 5th Floor Patient Room Renovation University of Alabama at Birmingham Birmingham, Alabama Project No.: H225017 A. A. SCOPE OF WORK: The project consists of converting 4 private patient room suites into 4 semi-private intermediate care patient rooms. The approximately 1,400 SF of renovated space includes architectural, electrical, plumbing, and mechanical demolition and new work. The construction budget is anticipated to be between $400,000 and $500,000. The work will be performed under a single Prime General Contractor who will coordinate the work of this project. Particular and specific care will be required to limit disturbances, coordinate shutdowns, and follow strict Infection Controls and Interim Life Safety Measures (ICRA/ILSM) requirements for the protection of patients, family and staff. The Prime General Contractors seeking to be pre-qualified will require experience with similar size and type healthcare projects performed in and adjacent to an operating hospital environment and with the implementation and maintenance of infection control measures, interim life safety measures, coordinating shutdowns, and maintaining a clean and organized job site in an operating hospital. The pre-qualification procedure is intended to identify responsible and competent prime contractor bidders relative to the requirements of the Project. Each prospective prime contractor bidder will be notified of the results of the pre-qualification, on or about October 07, 2022. The Owner reserves the right to waive technical errors in applications, extend or abandon the pre-qualification process, should the interests of the Owner appear to be promoted thereby. Bonds: A certified check or bid bond payable to the University of Alabama at Birmingham in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000 must accompany the bidder's proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract. Bids: Bids must be submitted on proposal forms or copies thereof furnished by the Architect. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject bids if such action is determined to be in the best interest of the Owner. After 12:00 noon of the date of the bid opening, proposals must be hand delivered and presented at the bid opening. Sealed proposals shall be submitted in triplicate and shall be properly identified. All proposals received after 2:00 p.m. on October 27, 2022 (the date and time set for the receipt of bids) will be returned unopened. Nonresident Prime Contractor Bidders: Under Section 39-3-5, Code of Alabama, 1975, nonresident prime contractor bidders must accompany any written bid documents with a written opinion of an attorney licensed to practice law in such nonresident prime contractor bidder's state of domicile as to the preferences, if any or none, granted by the law of the state to its own business entities whose principal place of business are in that state in the letting of any or all public contracts. Resident prime contractors in Alabama, as defined in Section 39-2-12, are granted preference over nonresident prime contractors in awarding of contracts in the same manner and to the same extent as provided by the laws of the state of domicile of the nonresident. Fire Alarm Work: In accordance with Title 34, Chapter 33A (the ACT), of the Code of Alabama 1975, bidders for fire alarm work of this project, if any, must include with their bid evidence of licensure as required by the ACT by including with the bid submittal a valid State Fire Marshal's permit.

Award

Medical

$573,700.00

Public - State/Provincial

Renovation

27

19

19

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
26
Bidding Soon
545
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

December 1, 2022

img_map_placeholder

620-666 19th St S, Birmingham, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.