Published May 10, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in San Francisco, California. Working plans call for the renovation of a 8,300-square-foot, two-story above grade medical facility.

Bid Cancelled. Project No- 09B-2173 San Francisco VA Medical Center 4150 Clement St San Francisco, CA 94121 Date: February 9, 2023, Project: Removal and Replacement of Hallway Flooring and Cove base Location: 1B and 2A wings, Building 203. Scope of Work The San Francisco VA Medical Center requires the services of a capable contractor to fulfill a construction requirement consistent with FAR 36.3 to accomplish basic renovations to facilitate an upgrade to outpatient care, and clinical spaces to meet current standards. Objective The nature of this requirement is to mitigate environmental liabilities and replace finishes with no changes to floorplans. These upgrades are to match adjacent areas to the greatest extent possible with the Government Furnished Property (GFP). The total area affected comprises roughly of 8,300 square feet of hallway area contained on wing 1B, and 2A (See Attachment 1 and 2: Floor Layout). Beyond itemized efforts, work is to include removal and disposal of existing contents and subsequent debris. Primary Components of this effort Include: Demolition and Removal of Existing Flooring and Cove Base Preparation of Area for Floor Finish Installation of New Flooring and Cove Base Flooring work is limited to spaces indicated in the Existing Conditions section of this document and as referenced in the attachments. This requirement comprises only of hallway area. Demarcation shall extend to the door frame of each room area within the hallway. Place of Performance All work shall be performed in Bldg. 203, 1B Wing Hallway See Attachment and 2A Wing Hallway as referenced in Attachment 1 and 2. Demolition and Removal Contractor shall provide all personnel, equipment, tools, vehicles, materials, supervision, and other items and services necessary to remove the existing flooring, to include wall base. Vinyl composite tile and mastic are considered potentially asbestos containing materials and are to be abated consistent with California OSHA standards. Disposal manifests are to be provided to the VA for all such quantities. For purposes of bidding, areas may have multiple layers of VCT and two such layers should be assumed for 50% of total impacted areas. Demolition shall be completed in accordance with Specification Section 02 41 00 Demolition (Attachment 3). Preparation Contractor shall provide all personnel, equipment, tools, vehicles, materials, supervision, and other items and services necessary to prepare the floors as specified. Floors are to be floated with self-leveler to ensure a smooth finish and leveling to finished grade of adjacent flooring. Floor leveling material shall be in accordance with specs provided. (See Attachment 4: Specification Section 090516 Surface Preparation). Installation of New Flooring and Cove Base Contractor shall provide all personnel, equipment, tools, vehicles, materials, supervision, and other items and services necessary to install the floors as specified. Contractor shall provide the materials for flooring, which will consist of new Amtico wood laminate flooring, product code W731, or equivalent. Additionally, the Contractor shall be responsible for providing rubber base 6 in height x 1/8 in width. The baseboards shall be rubber with a wood baseboard finish to match the wood laminate flooring. The contractor is responsible as well to provide all appropriate adhesive for both. Material specification must be in accordance with Specification Section 09 65 19 Resilient Flooring (Attachment 6) Submittals All submittals, including but not limited to material and work schedules, shall be submitted via ProCore for governments review. Contractor shall plan and provide government fourteen (14) business days for approval or disapproval. If submittal is disapproved, contractor shall resubmit submittal within seven (7) business days. Existing Conditions, Pertinent Information or Special Considerations: The contractor shall arrange an installation plan and schedule with the Site POC,and obtain an approval from Site POC prior to the commencement of the work. The identified work areas, hallways, are often filled with general pedestrian traffic. The contractor shall anticipate for all lobby and common areas to be occupied during normal business hours. To facilitate and prepare, the contractor shall plan for phasing to allow adjacent rooms to be vacated and returned to service to accommodate subsequent work. For the purposes of planning and phasing, the adjacent rooms will not be in use during the demolition and installation phase. Contractor shall plan phasing dependent upon the size of phased work area to allow for minimal disruption to the users. Each phase spans from removal of existing flooring to installation of new flooring and cove base. Performance of work must be completed within ten (10) calendar days from the start of the phase to the completion of the phase. Schedule shall provide for minimum of five (5) days must be allocated between phases to accommodate VA coordination and actions. Work on the same floor should be performed sequentially to minimize disruption to the users and pedestrians. For scheduling purposes, work may occur concurrently between the two (2) floors. The existing areas are in the 1B, and 2A wings of building 203 on the first floor and second floor. These floors are not ground accessible. Contractor material and contractor personnel access will be limited to designated stairwells and elevators. Asbestos This work is subject to an Infection Control Risk Assessment (ICRA). The Contractor shall provide all personnel, equipment, tools, vehicles, materials, supervision, and other items and services necessary as required for the asbestos treatment in accordance with ICRA, SPECIFICATION SECTION 02 82 13.19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT (Attachment 5: Abatement Specs). Each work area shall be sealed off with temporary barriers and be operated under negative pressure with HEPA filtered exhaust through exterior windows, and require provisions related to access and waste disposal to mitigate dust. Beyond ICRA requirements, asbestos abatement is extensive and will require isolation with added diligence. All ventilation shall be sealed and entry into the space shall be accommodated with a barrier that extends at least one foot to either side of the entry door. HVAC is to be sealed, with the exterior windows being used for HEPA filtered exhaust. Period of Performance and Performance Hours The period of performance for this requirement is one hundred eighty (180) calendar days from issuance of Notice to Proceed. The period of performance shall begin immediately upon issuance of Notice to Proceed, and all work shall be completed within the time specified, unless extension is granted by the Contracting Officer. Should the contactor decide to perform any of the required services before or after normal duty house, the contractor shall request approval prior to performance from the Site POC. Government Inspection and Acceptance: Government inspection and acceptance shall be conducted after each phase completion. The item shall be considered accepted upon the successful inspection and physical acceptance by the Site POC. Site POC/COR: Site POC for this requirement is Mr. Kelly Wommack, Maintenance Section Chief, Engineering Service, SFVAHCS. Warranty: The Contractor shall provide standard warranty to correct possible defects in contractor provided materials and workmanship. The warranty shall be provided for two (2) years commencing at the time of final acceptance. The Contractor shall provide standard warranty to correct possible defects in contractor provided materials and workmanship. The warranty shall be provided for two (2) years commencing at the time of final acceptance. All Requests for Information (RFIs) regarding this RFP must be submitted in writing and received NLT March 2, 2023, 2:00 P.M. PDT in order to allow replies to reach all prospective offerors in a timely manner. Questions/RFIs shall be sent via email to Carla Groves at carla.groves@va.gov and Daniel Jhun at Daniel.jhun@va.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Medical

$250,000.00

Public - Federal

Renovation

4

8

6

11

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Windows
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
61
Bidding Soon
1,985
All Active Projects
823
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

June 23, 2023

img_map_placeholder

4150 Clement St, San Francisco, CA


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Remove and Replace Floor in Building 203 1B,2A

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.