EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 1, 2022 at 7:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Cocoa Beach, Florida. Completed plans call for site work for a water / sewer project.

The City reserves the right to accept or reject any and all proposals or any part of any proposal and to waive any informality concerning the proposals when such rejection or waiver is deemed to be in the best interest of the City of Cocoa Beach. The bid requirements contained herein apply to all offers made to the City of Cocoa Beach by all prospective Proposers and include, but are not limited to, Request for Quotes, Request for Proposal, and Invitation to Bid. As such, the words bid and proposal are interchangeable in reference to all offers submitted by prospective Proposers. Question Deadline 10/14/2022 Any inquiries, suggestions or requests concerning clarification or solicitation for additional information shall be directed to the Engineer of Record, Brad Blais, P.E., Mead & Hunt, in writing to the email bidsDAB@meadhunt.com . All proposals shall be confidential pursuant to Florida Statutes, Chapter 119, entitled Public Records, Paragraph 119.07. The Proposal must show the bid number, bid name, time and date of the bid opening on the outside of the sealed bid package. Delivery of the sealed proposals to the City Clerk s Office on or before the above date is solely and strictly the responsibility of the Proposer. Late proposals will be returned unopened to the Proposer. It is the Proposer s responsibility to read and understand the requirements of this solicitation of proposal. Proposers are required to state exactly what they intend to furnish to the City via this solicitation and must indicate any variances to the terms, conditions and specifications of this proposal, no matter how slight. If variations are not stated in the proposal, it shall be construed that the proposal fully complies with all conditions identified in this proposal. Proposals must be submitted in ONE (1) UNBOUND original and FIVE (5) signed copies with a flash/jump drive containing one file in PDF format of the hard copy of the proposal exactly as submitted. The ORIGINAL proposal must be manually and duly signed in ink by a Corporate Officer, Principal, or Partner with the authority to bind the bidding company or firm by his/her signature. All quotations must be typewritten or filled in with pen and ink. Proposals having erasures or corrections must be initialed in ink by the Proposer. All prices, terms and conditions quoted in the submitted bid will be firm for acceptance for ninety (90) days from the date of the bid opening unless otherwise stated by the City. Should any interested offeror find any part of the specifications, terms, and conditions to be discrepant, incomplete, or questionable in any respect, it shall be the responsibility of the concerned offeror to call such matters to the attention of the City immediately upon receipt of the Request for Proposal. All questions should be submitted in writing to bidsDAB@meadhunt.com. If a proposed bidder desires to visit the project site, arrangements must be made with the Water Rec Department for a utility vehicle escort prior to the last day of questions. Vehicular access to the site will be unavailable during the bidding process. The project is subject to the provisions and regulations of FDEP s Clean Water State Revolving Fund Program which requires, among others, Davis Bacon Wages and American Iron and Steel Materials.

Award

Water / Sewer

$348,672.00

Public - City

Site Work

8

15

8

8

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Unit Prices, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Subdrainage
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
56
Bidding Soon
1,017
All Active Projects
441
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2022

January 2, 2023

img_map_placeholder

To Be Determined, Cocoa Beach, FL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

WRF Outfall Modifications

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.