BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2022 at 7:00 PM

Updated January 25, 2024

Site work and asbestos abatement for a mixed-use development in Dearborn Heights, Michigan. Conceptual plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

** As of December 5, 2022, this project was awarded to Environmental Maintenance Engineers, Inc . However, Project has been canceled by the school district* Questions may be addressed to: Nova Environmental, Inc. Ann Arbor, Michigan 48105 Dearborn Heights School District #7 Mr. Jason Perkins, (313) 203-3231 Contractor shall construct one frill enclosure for the removal of the materials identified in the Scope-of Work. All walls shall be sealed with a minimum of two (2) layers of four (4) mil polyethylene. All remaining floors shall be sealed with a minimum of two (2) layers of six (6) mil polyethylene. All remaining ceilings shall be sealed in one layer of four (4) mil polyethylene. Full decontamination chambers shall be constructed and used for the duration of the project. Prior to any set up, the contractor shall construct wood frame and polyethylene barriers, where identified by Owner's Representative. Security of the building must be maintained at all times. It is the Contractor's responsibility to furnish and install security partitions immediately upon removal of any exterior building component. All temporary enclosures must be completed prior to leaving the site each day. Partitions shall be constructed to satisfaction of Owner and Owner's Consultant. All ceiling materials (including ceiling tile, glue pods, plaster board, plaster and support structures to deck) shall be removed and disposed of as ACM. Ceiling Removal Areas - The Contractor shall remove fluorescence light fixtures, properly box bulbs and drum ballasts and have the bulbs and ballasts recycled by approved facility. All light fixtures to be disposed of by Contractor. All remaining ceiling fixtures shall be decontaminated and placed in a designated location or disposed ofifequested by Owner

Project Abandoned

Educational

$47,150.00

Public - City

Asbestos Abatement, Site Work

6

2

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
375
Active Projects
229
Bidding Soon
2,684
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2022

December 20, 2022

Project location map

4950 Madison St, Dearborn Heights, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.