Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 9, 2024 at 8:00 PM
Updated January 8, 2026
Site work and paving for a road / highway in San Carlos, California. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of July 9, 2024, an award has been announced for this solicitation. A timeline for construction has not been determined. Closed solicitation has been included below for reference. ............ RFP Engineering - The South Linden Avenue and Scott Street Grade Separation Project. Preliminary Engineering Design for the South Linden Avenue and Scott Street Grade Separation Project. The method of contractor selection has not been determined at this time. Questions Due Date: Nov 22nd 2022, 4:00 PM PST Intent to Bid Due Date: Dec 6th 2022, 2:00 PM PST
Design
Roads / Highways
$900,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2024
Multiple Locations, San Carlos, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
