BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Pagosa Springs, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Archuleta County, Colorado Board of County Commissioners ("County") invites qualified professional vendors ("Respondent") to submit proposals for the design and fabrication of 9 kiosks to be located at various bus stops in Pagosa Springs, Colorado. The selected firm will assist the County in designing and fabricating nine (9) wayfinding kiosks for various bus stops located throughout Pagosa Springs. The design portion should include drawings and specifications for kiosks. Kiosks are for wayfinding purposes and will include bus maps and route information. The project will include coordination with the County and Town of Pagosa Springs for design elements and locations. See below for more detail of the tasks required. The Archuleta County Transportation Department/Mountain Express Transit (MET) provides safe, reliable, affordable, and efficient fixed-route and dial-a-ride public transportation for the residents of and visitors to Archuleta County and Pagosa Springs. Archuleta County and Pagosa Springs have approximately 13,765 (2018) full-time residents throughout, with up to 17,000 visitors at one time during summer months. The current bus stops have very limited signage and information for residents and visitors to understand the routes and schedules. The County, through a federal grant, is requesting proposals to design and fabricate kiosks that will assist riders with access to transit services. The period of this project will be 8 months from execution of a contract (expected to be executed in December of 2022). All questions shall be submitted in writing to: lvanoni@archuletacounty.org The contract period shall be for eight months. The County anticipates that work shall commence upon approval and award of contract. October 7, 2022 Questions Due August 1, 2023 Project Completion November 22, 2022 BoCC Awards Contract (estimated date) The method of Contractor Selection has not been Determined at this time.

Post-Bid

Roads / Highways

$90,000.00

Public - County

Paving, Site Work

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
3
Bidding Soon
57
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2022

December 1, 2022

img_map_placeholder

Multiple Locations, Pagosa Springs, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.