Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Breckenridge, Texas. Contact the soliciting agency for additional information.
For PS&E package questions call: Chris Graf, P.E. 2495 hwy 183 n Brownwood, tx 76802 325/643-0441. Time for completion: 105 working days ETC length: 269.1390#mi ETC dbe goal: 0.0 % For questions regarding a proposal call 512/416-2498 ------------------------------------------------------------------------------ County control limits from Highway project limits to Stephens 0011-09-075.132 mi e of sh67 Us 180 f 2023(156).113 mi e of fm 207 Length: 1.3660 miles Eastland 0007-06-270 end of pavement (nfr) Ih 20 f 2023(158).6 miles east of sh 16 Length: 3.1970 miles Eastland 0007-06-271 end of pavement (sfr) Ih 20 f 2023(158).6 miles east of sh 16 Length: 3.1560 miles Eastland 0007-06-278.17 mi w of sh16 (crcp) Ih 20 f 2023(158).6 mi e of sh16 (cs) Length: miles Coleman 0054-02-036 taylor c/l Us 84 f 2023(158)near rough creek Length: 9.8390 miles Coleman 0054-14-005 us 84 n of novice Fm 702 c 54-14-5 us 84 s of novice Length: 4.4880 miles Mcculloch 0071-01-056 us 377 Us 87 f 2023(158) us 190 Length: 0 miles Coleman 0078-03-058 sh 153, s. Sh 206 f 2023(156) us 67 Length: 6.0380 miles Comanche 0079-02-054 lm street Us 67 f 2023(158)0.5 mi w. Of indian creek Length: 0 miles Brown 0127-04-039.573 mi s of cr 339 Us 183 f 2023(157) us 67 Length: miles Comanche 0183-01-057.5 mi n of 1476 Sh 36 f 2023(156)1.87 mi n of 1702 Length: miles Lampasas 0231-15-042 1457 Fm 580 f 2023(156) us 183 Length: 14.27 miles Stephens 0257-01-045 fm 2231 Us 183 f 2023(156) fm 1032 Length: 0 miles Eastland 0257-02-040 us 183 Sh 112 f 2023(156)union pacific rr Length: 8.3290 miles Eastland 0314-05-042.6 mi e of sh 16 Ih 20 f 2023(158)erath c/l Length: 1.8180 miles ------------------------------------------------------------------------------- TXDOT - US 180 - Preventive Maintenance
Award
Roads / Highways
$14,954,533.00
Public - State/Provincial
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 2, 2022
January 2, 2023
US-180, Breckenridge, TX
Related To This Project
Breckenridge, TX
Bid Date: Dec 17 2020
Breckenridge, TX
Bid Date: Dec 05 2022
Breckenridge, TX
Bid Date: Jan 05 2023
Breckenridge, TX
Bid Date: Jan 06 2023
Breckenridge, TX
Bid Date: Dec 28 2022
Breckenridge, TX
Bid Date: Aug 06 2019
Breckenridge, TX
Bid Date: Apr 29 2022
Breckenridge, TX
Bid Date: Jul 08 2020
Fort Stockton, TX
Bid Date: Sep 07 2022
Alpine, TX
Bid Date: May 21 2021
Fort Worth, TX
Bid Date: Oct 18 2022
McAllen, TX
--
San Marcos, TX
--
Donna, TX
--
Celina, TX
Bid Date: Nov 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.