EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 10, 2022 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Oakley, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work to be performed under this contract generally consists of, but is not limited to the following: Mobilization and demobilization; traffic control and construction signage; removal and replacement of traffic striping, marking, and markers; removal of curbs and gutters, removal of sidewalks and retaining curbs, clearing and grubbing, tree removal and relocation, roadway excavation including removal of pavement and base material, removal of subbases, native material fill, construction of new concrete curb and gutter, sidewalk, parking islands, curb ramps and bus stop; rubberized hot mix asphalt (RHMA), hot-mix asphalt (HMA) pavement and base; storm drain improvements; driveways, bioretention areas with deepened curbs, installation of new street lighting service, street lighting; electric vehicle charge stations; installation of new irrigation services, planting and irrigation, site furnishings, trash enclosure, signing and striping and other work as shown on the Contract Plans, as specified in the Contract Documents, and as directed by the City Engineer. Each bid must be accompanied by a cashier's check, certified check, or Bidder's Bond executed by a responsible corporate surety authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California, payable to the City of Oakley, in an amount not less than ten percent (10%) of the amount of the Base Bid. The successful bidder will be required to furnish a Performance Bond in an amount equal to one-hundred percent (100%) of the contract price, and a Labor and Material Bond in an amount equal to onehundred percent (100%) of the contract price. Said bonds shall also be executed by a corporate surety authorized to engage in such business in the State of California and be made payable to the City of Oakley. If the successful bidder fails, neglects, or refuses for TEN (10) calendar days after the award of the contract to enter into the contract to perform the work, the cashier's check, certified check, or Bidder's Bond accompanying the bid and the amount therein named, shall be declared forfeited to the City and shall be collected by it and paid into its general fund. No bidder may withdraw his/her bid for a period of NINETY (90) calendar days after the date set for the opening thereof, and the same shall be subject to acceptance by the City during this period. The City Council reserves the right to reject any or all bids, waive any irregularities in any bids and its determination as to which bid is the lowest responsible bid and is for the best interest of the City shall be final. The City Council shall have NINETY (90) calendar days from and after the opening of the bids within which to make its determination. The Contractor receiving the award of the contract shall begin work within TEN (10) Working days after receipt of the Notice to Proceed and shall diligently prosecute the same to completion within the time restrictions as listed in the technical specifications and all work shall be completed by the time allotted in the technical specifications.

Award

Roads / Highways

$4,963,070.00

Public - City

Paving, Site Work

83

12

25

8

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Exploratory Excavations
Division 05 - Metals

Division 05 - Metals

Decorative Metal
Division 12 - Furnishings

Division 12 - Furnishings

Other Furnishings, Site Furnishings
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Irrigation, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Storm Utility Drainage Piping

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
139
Bidding Soon
2,166
All Active Projects
923
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2022

December 19, 2022

img_map_placeholder

Multiple Locations, Oakley, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Downtown Gateway Plaza and Infrastructure Improvement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.