BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Culver, Indiana. Contact the soliciting agency for additional information.

The Town of Culver is requesting quotes for sidewalk snow removal for the 2022-2023 winter season. Quotes can also be dropped off during normal business hours, if preferred prior to the date and time above. For questions, please contact Ginny Munroe at 574.842.3140. Contractor will remove snow or ice from all public sidewalks within the location parameters detailed below. Snow removal service will proceed automatically upon accumulation of 2" of snow or by request of the Town Utilities Superintendent or Town Manager. Plowing should begin at 5:30 a.m. when overnight snowfall accumulations of 2" or more have fallen. Snow must be removed and can be placed on town property at the Culver Street Garage or in other areas approved by the Culver Utilities Superintendent or Town Manager. In commercial areas where front entrances to commercial buildings are within 24 inches of the public sidewalks, snow clearing shall include the building main entrance and sidewalk snow removal 6 feet in width. In residential areas, sidewalk clearing shall be a minimum of 40 inches wide. Salt shall be applied to all walkways after snow is cleared unless otherwise specified by the Culver Utilities Superintendent. In the event of an ice event or a dusting of snow, salt shall be applied to all walkways after the event has occurred if requested by the Culver Utilities Superintendent or Town Manager. Your bid can indicate pricing for each type of event. For example, you can include event-specific pricing for: 2 inches of snow, ice event or dusting of snow (salt only), 4-6 inches, 6+ inches. The contractor will coordinate with Culver Utilities Superintendent to avoid conflicts with street snow plowing whenever possible. The sidewalk on the west and north side of Lakeshore Drive from the northern property line at 1125 Lakeshore Drive (Liquor Store) and continuing down the west and north sides only of Lakeshore Drive to the intersection with Main Street. Both sidewalks (east and west sides) of Main Street from Lakeshore Drive to Marmont Street. Prices should be quoted on a per event basis and billed to the town on a monthly basis with a net 30 payment schedule. The Town of Culver reserves the right to reject all quotes if necessary and the low quote is not guaranteed to receive a contract for the services listed above. Proof of liability insurance and other documentation will be required prior to contract award.

Post-Bid

Sidewalks / Parking Lot

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
69
Bidding Soon
1,403
All Active Projects
697
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2022

November 11, 2022

img_map_placeholder

Multiple Locations, Culver, IN

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.