EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 23, 2023 at 7:00 PM

Updated October 1, 2024

Demolition, site work and addition to an educational facility in Syracuse, New York. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

** As of January 23, 2023 , this project has not yet been awarded. A timeline or award has not yet been established.** The scope of work is to renovation approximately 800 square feet of the second floor gym space within the IHP building to accommodate (5) proposed exam rooms. These exam rooms will require services to be extended from the existing building to provide the M/E/P/FP needed within the rooms. Some additional work will be required within the first floor plenum space to complete the necessary plumbing installation. All work on this Contract is to be completed within/by within 125 days after the date of the Notice to Proceed. Effective 1/1/06, in accordance with State Finance Law Section 139-j, all questions pertaining to the solicitation shall be made formally to the designated contact in Contracts & Campus Purchasing: Mrs. Shawna Frigon & Ms. Ivy Lopez SUNY - Upstate Medical University, 750 East Adams Street, Syracuse, New York 13210, Phone: (315) 464-5874 (315) 464-4595 Fax: (315) 464-4679, Project Manager: Matthew Blair, RA, Upstate Medical University, Design and Construction Department, 650 South Salina Street, Syracuse, New York, 13202, Phone: (315) 464-3813, Consultant: Kate Holevinski, HBT Architects, 2 Elton Street, Rochester, NY 14607, Phone: (585) 510-2497. All questions pertaining to the solicitation during the restricted period shall be made formally to each Designated Staff concurrently: Contracting Staff: Ivy Lopez Contracts Administrator Contracts & Campus Purchasing SUNY - Upstate Medical University 750 East Adams Street Syracuse, New York 13210 Phone: (315) 464- 4680 Email: lopezi@upstate.edu Project Manager Matthew Blair Project Manager Design and Construction SUNY - Upstate Medical University 750 East Adams Street Syracuse, New York 13210 Phone: (315) 464- 3813 Email: blairma@upstate.edu Consultant Kate Holevinski HBT Architects 2 Elton Street Rochester, New York 14607 Phone:(585) 510-2497 email:kholevinski@hbtarchitects.com Bids must be submitted in triplicate (3), which must have original signatures on the forms provided by the University, in accordance with the instructions contained in the Information for Bidders. Security will be required for each bid in an amount not less than five (5) percent of the Total Bid. It is the policy of the State of New York and the State University of New York to encourage minority business enterprise participation in this project by contractors, subcontractors and suppliers, and all bidders are expected to cooperate in implementing this policy. The selected contractor must comply with M/WBE goals. State University of New York goals are: 21% MBE and 9 % WBE participation of the total contract value. State University of New York also has a goal for the Work Force participation: EEO 10% WBE and EEO 10% MBE of total work force on the project. The State University of New York reserves the right to reject any or all bids. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 21% Women Owned Sub-Contracting Goal: 9% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Business entities awarded an identical or substantially similar procurement contract within the past five years: RJ Ortlieb Murnane Building Contractors CBD C&S Companies GM Crisalli

Bid Results

Educational

$549,500.00

Public - State/Provincial

Addition, Demolition, Site Work

27

21

2

9

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds, Spare Parts, Demonstration and Training, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Curing, Cast Decks and Underlayment
Division 05 - Metals

Division 05 - Metals

Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Architectural Woodwork, Architectural Wood Casework, Plastic-Laminate-Clad Architectural Cabinets
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Sheet Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, Air Terminal Units, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Screening Devices, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, General Vehicles, Carts

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
91
Bidding Soon
981
All Active Projects
474
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2022

December 8, 2022

img_map_placeholder

505 Irving Ave, Syracuse, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

IHP Addition of Exam Rooms for PM and R

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.