BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Gold Beach, Oregon. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Sealed bids for the construction of the Morrill Bridge Replacement for the Curry County Road Department (Owner) - Remove the existing Morrill bridge over Fork Floras Creek after completion of the new bridge. Bidders must prequalify five (5) days prior to the bid opening with the Owner. The project consists of: Construct new gravel roadway along a new alignment. Install required guardrails. Construct new 100-foot bridge. Provide grouted riprap and seeded bank stabilization. Install new storm water drains, gravel ditch and riprap basin. Install new asphalt concrete pavement on bridge deck and roadway. Remove existing bridge and pilings. Provide traffic control required for construction. Provide required erosion control measures. Comply with all regulatory permits. Bids not fully completed in accordance with the Instructions to Bidders will not be considered. A Bid Security executed in favor of the Owner in the amount of not less than 10% of the total amount of the Bid is required. Per ORS 279C.385 (2), Bid Security is to be forfeited as fixed and liquidated damages should the Bidder neglect or refuse to enter into a Contract and provide suitable insurance certificates, bonds, and other required documents for the faithful performance of the work in the event the Bidder is awarded the Contract. All bidders must be equal opportunity employers, provide proof of an employee drug testing program, be registered with the Construction Contractors Board and comply with all state and federal laws. Each Bidder must submit a First-Tier Subcontractor Disclosure Form, Evidence of Authority to Sign Bid, and Evidence to do Business in the State within two working hours of the time for receipt of the Bid. Contractors and all subcontractors shall pay at least the state prevailing rate of wage as determined under ORS 279C.815. ORS 279C.800 to 279C.870 will be administered and enforced in accordance with state law and regulations. Work under this Contract will be funded in part with funds from the State Funded Local Project Program Loan No. 33365. No Bid will be received or considered by the Owner unless the Bid contains: 1) a statement that Bidder will comply with the provisions of 40 USC 276a and ORS 279C.840 and 2) a statement as to whether the Bidder is a resident Bidder as defined in ORS 279A.120. The Owner reserves the right to reject any or all Bids, to waive all informalities, and to accept such Bids that in the opinion of the Owner are in the best interest of the Owner.

Bid Results

Bridges / Tunnels

$1,677,113.00

Public - County

Demolition, New Construction, Paving, Site Work

27

24

4

8

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
5
Bidding Soon
85
All Active Projects
38
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2022

December 1, 2022

img_map_placeholder

To Be Determined, Gold Beach, OR

Related To This Project


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.