Site work and paving for a mixed-use development in Grimes, Iowa. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Notice is hereby given that a public hearing will be held by the City of Grimes, Iowa on the proposed Contract Documents (plans, specifications, and form of contract), and estimated total cost for the Grimes Plex project at its meeting at 5:30 P.M. on the 25 th day of October, 2022, in the City Council Chambers, Grimes Community Complex, 410 SE Main Street, Grimes, Iowa, 50111. Work on the improvement shall be commenced any time after a written Notice to Proceed is issued, no earlier than October 26, 2022 and no later than November 2, 2022, and shall be completed as stated below. The Notice to Proceed will be issued after the preconstruction conference, which is expected to occur in October 2022. A copy of said plans, specifications, and form of contract, and estimated total cost is now on file in the office of the City Clerk and may be examined at Grimes City Hall, 101 NE Harvey Street, Grimes, Iowa, 50111. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. Failure to submit a fully completed and accurate Bidder Status Form with the Proposal may result in the Proposal being deemed non-responsive and may result in the Proposal being rejected. The Grimes Plex project includes the construction of multiple recreational synthetic turf fields with supporting public infrastructure improvements located just west of NE Heritage Drive, south of NE 12 th Street and east of a tributary to Little Beaver Creek. The project consists of earthwork, subgrade preparation, topsoil, sanitary sewer main, storm sewer, water main with appurtenances, PCC sidewalk pavement, PCC road/parking lot pavement, striping/symbols, fencing, athletic field appurtenances, synthetic turf, seeding/restoration, and other associated work. Base Bid improvements include construction of approximately 6,000 CY of earthwork; 1,603 LF of 6-inch sanitary sewer main and associated cleanouts; 7 sanitary manholes; 10,096 LF of storm sewer/subdrain between 6-inch diameter and 24-inch diameter; 56 storm sewer structures; 1,820 LF of 6-inch water main/2-inch service; 44,348 SY of 6-inch to 8-inch PCC pavement; 3,161 SY of 4-inch to 6-inch PCC sidewalk/shared use path pavement; subgrade preparation; subgrade treatment; pavement markings; traffic control; erosion control/seeding/landscaping; and miscellaneous associated work necessary to complete the project. Bid Alternate #1 improvements include construction of approximately 26,500 SY of 5-inch reinforced shared use path pavement; 15,645 LF of chain link fence; 62 chain link swinging gates; 18 tie-back tension netting backstops; 3,155 LF of ball control netting; 36 dugout roofs; and subgrade preparation Bid Alternate #2 improvements include the construction of 6 synthetic turf fields with a total of approximately 1,184,000 SF of synthetic turf Each Bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work bid upon and will furnish after the award of Contract a corporate Surety Bond, in a form acceptable to the City of Grimes, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. The Bidder's security shall be in the amount fixed in the Instructions to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the City of Grimes. The bid shall contain no condition except as provided in the specifications. The City of Grimes reserves the right to defer acceptance of any bid for a period of sixty (60) calendar days after receipt of bids and no bid may be withdrawn during this period Each successful Bidder will be required to furnish a corporate Surety Bond in an amount equal to one hundred percent (100%) of its Contract price. Said Bond shall be issued by a responsible Surety approved by the City of Grimes and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City of Grimes from claims and damages of any kind caused by the operations of the Contract and shall also guarantee the maintenance of the improvements caused by failures in materials and construction for a period of two (2) years from and after acceptance of the Contract. The City of Grimes, Iowa, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Payments will be made on the basis of estimates prepared by the Contractor and approved by the Engineer, solely for the purpose of payment; approval by the Engineer, or the City Council, shall not be deemed as approval or acceptance of the workmanship or materials. The Contractor will be compensated for 95% of the work completed during a payment period, with the remaining 5% being retained in accordance with the Iowa Code. Regular payments approved by the Engineer will be made following the next scheduled City Council meeting. The retainage payment will be released following acceptance of the project by the City of Grimes and satisfaction of the retainage payment provisions and requirements stipulated in the Iowa Code. The City of Grimes will issue a sales tax exemption certificate to the Contractor for all material purchased for incorporation into the project. Tax exemption certificates are applicable only for the specific project for which the tax exemption certificate is issued. The Contractor shall substantially complete Base Bid - Phase 1 of the project by March 17, 2023 and Base Bid - Phase 2 of the project by June 15, 2023. Substantial completion for each phase shall be defined as all utility, grading, and pavement completed with the new parking lots and adjacent sidewalks fully open to traffic and fully operational. Should the Contractor fail to substantially complete the work within these timeframes, liquidated damages of Two Thousand Dollars ($2,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the Base Bid of the overall project within ten (10) calendar days after substantial completion dates subject to seeding date restrictions. Full completion of the Base Bid for each phase shall be defined as all permanent infrastructure construction completed, all areas fully seeded/restored and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work within this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). The Contractor shall substantially complete Bid Alternate #1 - Phase 1 of the project by March 17, 2023 and Bid Alternate #1 - Phase 2 of the project by June 15, 2023. Substantial completion for each phase shall be defined as all sidewalks adjacent to the fields, fence posts, and netting posts completed with the new sidewalks fully open to traffic and fully operational. Should the Contractor fail to substantially complete the work within these timeframes, liquidated damages of Two Thousand Dollars ($2,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete Bid Alternate #1 - Phase 1 of the project by May 12, 2023 and Bid Alternate #1 - Phase 2 of the project by September 22, 2023. Full completion of Bid Alternate #1 for the project shall be defined as all fencing, netting and, dugouts completed and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work within this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). The Contractor shall substantially complete Bid Alternate #2 - Phase 1 of the project by April 21, 2023 and Bid Alternate #2 - Phase 2 of the project by September 1, 2023. Substantial completion of Bid Alternate #2 for each phase of the project shall be defined as synthetic turf fully open to use. Should the Contractor fail to substantially complete the work within this timeframe, liquidated damages of Two Thousand Dollars ($2,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete Bid Alternate #2 for the project within ten (10) calendar days after substantial completion dates. Full completion of Bid Alternate #2 for the project shall be defined as all permanent infrastructure construction completed and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work within this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). The City of Grimes does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.

Bid Results

Playgrounds / Parks / Athletic Fields

$23,562,382.00

Public - City

Paving, Site Work

65

7

14

4

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
38
Bidding Soon
577
All Active Projects
244
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2022

October 26, 2022

img_map_placeholder

Multiple Locations, Grimes, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.