BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Hartland, Michigan. Completed plans call for the renovation of a educational facility.

**As of October 6, 2022 , this project has not yet been awarded. The project is expected to be awarded on Mid November.** The intent of this Bid request is to obtain an offer to perform Work to complete Athletics 2023 Renovations located at 10635 Dunham Rd, Hartland, Michigan48353 A. Alternate 1 - To provide a new Toilet Room Buildings at the Ball Fields. 1. Base Bid: To construct the new Toilet Building as indicated. Work will generally include: a. Excavation and backfill for foundations. b. Concrete foundations, and slabs c. Exterior brick and CMU insulated cavity walls d. Interior masonry partitions. e. Rough Carpentry including nailers, blocking, engineered wood trusses, and plywood roof deck. f. Shingles, flashings, soffits, louvers, and vents. g. Doors frames and hardware h. Windows and glazing i. Casework, specialties, and lockers j. Floor, wall and ceiling finishes, k. Electrical equipment, conduit, wiring, fixtures and devices. l. Plumbing piping, insulation, controls and fixtures. m. Mechanical equipment, controls, ductwork, insulation, diffusers, dampers, and grilles n. Other work as indicated. 2. Alternate Bid: To exclude the work related to the construction of Toilet Room Building at the ball fields: a. Provide alternate location for electrical services to location adjacent to the new press box as indicated. B. Alternate 2 - To provide new prefabricated storage buildings. 1. Base Bid: To provide 10' x 12' prefabricated storage building. Work Includes: a. Prefabricated storage building as detailed. b. 6" compacted crushed stone base c. Electrical power, fixtures, devices, and controls. b. Other work as indicated 2. Alternate Bid 2A: To provide prefabricated storage buildings 12' x 16" in lieu of 10' x 12'. 3. Alternate Bid 2B: To deduct from the Base Bid, the provision of the storage building. C. Alternate 3. - To provide a new Press Box at the Soccer Field. 1. Base Bid: To provide prefabricated Press Box as indicated. Work will generally include: a. Supply and installation of a Prefabricated Press Box assembly as detailed. b. Supply and installation of the steel support structure and foundations. c. Supply and installation of access stairs and railings. d. Supply and installation panel enclosure. e. Supply and installation door, frame, and hardware for panel enclosure. f. Provide connection for power and data 2. Alternate Bid: To deduct the press box work from the base price and to provide only electrical conduit, feeders and data conduit to location of press box and terminate. D. Alternate 4 - To provide alternate scoreboard. 1. Base Bid: To provide Daktronics Score Board as specified. 2. Alternate Bid: To provide Fair play scoreboard with matching features abs the basis of design scoreboard, in lieu of the Daktronics scoreboard. All bid forms and documents will be available after September 19, 2022 and can be found and submitted online at website. The School Board will not accept any bid submitted after the indicated due time and date. Bidders will be required to submit with their Bid Proposals a Bid Security by a qualified surety authorized to do business in the state where the Projects is located. All Bid Proposals shall be accompanied by the following two forms: Familial Disclosure Form (in accordance with MCL 380.1267) and an Iran Economic Sanctions Act Form (in compliance with Michigan Public Act No. 517 of 2012). Bid Proposals that do not include these two sworn and notarized forms shall not be accepted. Please contact Ryan.madden@bartonmalow.com with any questions. Bidder shall promptly notify Barton Malow Builders in writing of all ambiguities, inconsistencies, or errors that it may discover upon examination of the Bidding Documents or upon examination of the Project site and local conditions. Bidders requesting clarification or interpretation of the Bidding Documents shall make a written request, which shall reach Barton Malow Builders at least 7 days prior to the date for receipt of Bid Proposals. Direct all questions to: B. Barton Malow Builders Representative Name: Ryan Madden, email; ryan.madden@bartonmalow.com , telephone 248-763-2799 Project No- TMP20085B, 20086D, 20087C, 20087D, 20089C Desired Construction Start: Not later than March 2023. Desired Substantial Completion Date: Not later than August 7, 2023. Bid Results: Masonry-Schiffer Mason Contractors, Inc.-$284,000 General -Construction Solutions, Inc-$681,000 Glazing-Daniels Glass Inc-$80,695 Mechanical-Tempco Mechanical Contractors, inc-$407,650 Electrical-Innovated Energy Controls-$1,226,720 Synthetic Fields-Sprinturf-$1,081,100 Synthetic Track-Goddard Coatings Sport Surfaces-$299,900

Bid Results

Educational

$4,061,065.00

Public - City

Renovation

124

73

27

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
342
Active Projects
202
Bidding Soon
2,763
All Active Projects
1,109
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 7, 2022

March 1, 2023

August 7, 2023

img_map_placeholder

10635 Dunham Rd, Hartland, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.