BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Long Beach, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

07-LA-605 PM R0.00 / PM R0.29 07000004451 Project No. 11695.001 The work to be done consists primarily of constructing a sound wall on concrete barrier with pile foundation along the NB I-605 edge of shoulder, including: replacement of conflicting irrigation lines; installation of two drainage inlets; replacement of two 18-inch corrugated steel pipes for drainage; replacing an existing electrolier with barrier mounted electrolier; relocating roadside signs; installing planting; and installing fencing and soundwall with aesthetic treatment (collective referred to as "Work"). Bids are required for the entire Work. Please note that for this Work, minimum qualifications apply. Information concerning these requirements is also located on the City's website at the URL noted in the "Receipt of Bids" section above. Bidders are advised that this project is subject to the City's SBE Program. See Divisions C and E of the Specifications. This Work is covered by a Citywide Project Labor Agreement (PLA) entered into by the City of Long Beach with the Los Angeles/Orange Counties Building and Construction Trades Council and the signatory Craft Unions. The PLA establishes the labor relations Policies and Procedures for the City, the Contractor and subcontractors awarded contracts for the Work and for the craft persons employed by the Contractor or subcontractor while engaged in the Work. See Division E of the Specifications for the applicable PLA. The Contractor shall possess a valid California Class A, Contractor license at the time of contract award. The City may deem any Bidder who fails to possess the required license to be non-responsive. Bidders must scan and upload with their bid documents a certified check or bank draft payable to the City of Long Beach, drawn on a solvent bank in the United States of America, or a satisfactory bond in an amount not less than 10 percent of the Bid. The original of the above instrument shall be submitted to the City Clerk in a sealed envelope and must be received and time/date stamped by the City Clerk's Office no later than the time and date stated for receipt of bids. The outside of the envelope shall clearly state "Bid Security for R-7171, I-605 Soundwall, Coyote Creek to Spring St. Do Not Open With Regular Mail." The City Clerk's Office is located at 411 W. Ocean Blvd, 1st Floor, Long Beach, CA 90802. Bidders may proceed directly to Window 12 without pulling a service ticket. The bid security shall serve as a guarantee that the Bidder, if awarded the Contract, will execute and deliver to the City Engineer, no later than fifteen (15) calendar days after the date shown on the "Notice of Award," the following items: 1) The Contract for doing the work, and 2) A corporate surety bond in favor of the City of Long Beach in an amount not less than 100 percent of the Contract price for the faithful performance of the Contract, and 3) A corporate surety bond in an amount not less than 100 percent of the Contract price for the payment of all labor and material claims, and 4) Evidence of required insurance coverage. Failure to submit the items noted above when specified may result in the City, in its sole discretion, declaring the Bid Security forfeited and depositing same into the City Treasury. The City will retain the bid security accompanying all bids until it awards a contract. The City will retain the Bid security submitted with the Bid of the Bidder to whom an award of Contract is made, and the Bid security of the next higher Bid, until the Contract between the Bidder to whom award of the Contract is made and the City has been executed. In the event the contract to be awarded hereunder, including Specifications and other documents incorporated therein by reference, provides for the withholding of monies by the City to ensure performance of such contract, the Contractor may: a) deposit with the City as a substitute for said monies, securities listed in Section 16430 of the California Government Code or bank or savings and loan certificates of deposit, or both, equivalent to the amount withheld; or b), request payment of retentions earned directly to the escrow agent at the expense of the contractor, provided Contractor requests, in writing, to make such substitution within 5 days of the date of the Notice of Award of the Contract and bears all expenses in connection therewith. Either option shall be in accordance with Public Contract Code Section 22300. This project is a public work under Labor Code 1720 et seq. Pursuant to Division 2, Part 7, Chapter 1 of the Labor Code of the State of California, the Director of Public Works of the City by and on behalf of the City Council has obtained from the Director of the Department of Industrial Relations of the State of California the general prevailing rate of per diem wages, and the general prevailing rate of holiday and overtime work in the locality in which the public work is to be performed for each craft, classification or type of workers needed to perform the Work. Copies of prevailing rate of per diem wages are on file in the office of the City Engineer, 5th floor, City Hall, 411 West Ocean Boulevard, Long Beach, California 90802, and shall be made available upon request. Copies may also be obtained on the California Department of Industrial Relations website. This project will be subject the 2022-2 prevailing wage rate, as determined by the Director of the Department of Industrial Relations for the State of California. The Contractor to whom the Contract is awarded, and its subcontractors is directed to pay not less than the general rate of per diem wages for each craft, classification, or type of worker needed to execute the contract. Contractor is required to post a copy of the determination of the director of the prevailing rate of per diem wages at each job site. Contractors are required to pay at least the California minimum wage for the basic hourly rate in all cases where the published prevailing wage rate is below the California minimum wage. Any and all employer payments required by the prevailing wage determinations must also be paid. If the California minimum wage is increased in the future to an amount above that shown in the prevailing wage determination, the basic hourly rate in that determination automatically increases to the new minimum wage. This project is a public work and subject to the following: No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractors are further cautioned that certified payrolls shall be submitted electronically directly to the Department of Industrial Relations. The Contractor shall comply with Section 1777.5 of the Labor Code concerning the employment of apprentices by the Contractor or any subcontractor under the Contractor and, by submitting a Bid and executing the Contract, the Contractor stipulates that it shall so comply. Contractor and subcontractors are subject to penalties, including, but not limited to, under Labor Code 1775, 1776, 1777.7 and 1813, for failure to comply with Sections 13.28 through 13.31 and/or Labor Code 1720 et seq. There will be a combined SBE/VSBE/LSBE goal of 10% on this contract.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

91

17

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
129
Bidding Soon
2,317
All Active Projects
1,064
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2022

December 5, 2022

img_map_placeholder

I-605, Long Beach, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.