BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in High Point, Florida. Completed plans call for site work for a water / sewer project.

As of November 17, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Estimated cost is $4.3Million. The bids will be for furnishing materials (exclusion of owner furnished ductile iron pipe), labor, supervision, equipment, supplies, fees, expertise, and services necessary for the replacement of approximately 18,500 linear feet of water main within Kings Point Flanders and Capri Subdivisions, located on Linton Boulevard and South Jog Road. The construction services consist generally of, but are not limited to, installation of potable water mains, fire protection improvement, replacement of water service lines, and all associated appurtenances and work indicated in the construction drawings and technical specifications. All conditions and requirements for bid submission, consideration, and award are contained in the Bid Documents. This will allow the County to notify you of upcoming solicitations. In addition, there may be certain documents necessary for submittal of a bid which are exempt from public disclosure. Bidders shall download and submit a Plan Holder Registration form (Bid Document attachment) to access these exempt documents. Registered Plan Holders will automatically receive notification of addenda and project updates. Bidders requiring Bid Documents mailed must provide an express mail account number to the PBCWUD Engineering Division. The bill will be charged to the recipients account. When Bid Documents are obtained through a plan house, Bidders must notify the Palm Beach County Water Utilities Department s Project Manager via e-mail in order to be registered to receive project addendums and communications. Questions may be addressed in writing to Ralph Estime, PMP at Destime@pbcwater.com or Palm Beach County Water Utilities Department, 8100 Forest Hill Blvd., West Palm Beach, FL 33413. Pursuant to the Palm Beach County Code Section 2-80.20 2-80.40, the Equal Business Opportunity (EBO) Ordinance, the County will provide contracting and subcontracting opportunities for S/M/WBEs. The following Affirmative Procurement Initiatives (APIs) apply to this project: The SBE subcontracting goal for this project is a mandatory minimum of 20% participation, See EBO Ordinance Section 2-80.27(1)(c), of which 3% shall be among certified African American and/or Hispanic American owned firms, See EBO Ordinance Section 2-80.27(2)(b). Explanation of goal setting committee s reasons for applying this API: The goal setting committee s reason for applying this particular API to this project was that the most recent data on the utilization of the foregoing MBEs indicates that contracts of this type have exhibited significant disparities in the utilization of these MBEs. When a mandatory SBE or M/WBE goal applies to this solicitation, then any bid that fails to comply with the required goal shall be deemed non-responsive after the period allowed for waiver requests has lapsed. If a bidder is unable to comply with a required goal, such bidder shall submit a request for a waiver or partial waiver at least 7 days prior to the bid due date. If a bidder requests a waiver from a goal from the Office of EBO at least 7 days prior to the bid due date, then the bid due date will be extended pending the outcome of a waiver request. Additionally, if the waiver is granted the solicitation will be amended accordingly and the due date extended again. Fillable pdfs of all EBO forms can be found on the OEBO website electronically At the time of bid submission each bidder, and all identified subcontractors, must possess all professional licenses or certifications required by the State of Florida and/or Palm Beach County, as applicable, for the purpose of performing the specified work. Bid proposals must be submitted on the forms provided by Palm Beach County and accompanied by a bid bond security in favor of Palm Beach County in the amount of not less than five percent (5%) of the bid price. A public construction bond (100%) will be required of the successful bidder within fourteen calendar days of notification from County. In accordance with F.S. 287.133(2)(a), persons and affiliates who have been placed on the convicted vendor list may not submit bids, contract with, or perform work (as a contractor, supplier, subcontractor or consultant) with any public entity (i.e. Palm Beach County) in excess of Ten Thousand dollars (or such other amount as may be hereafter established by the Florida Division of Purchasing in accordance with F.S. 287.017) for a period of 36 months from the date of being placed on the convicted vendor list. The Board of County Commissioners reserves the right to waive any bid irregularities, informalities, or technical deficiencies and to reject any and all bids.

Award

Water / Sewer

$5,820,611.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

20

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
53
Bidding Soon
1,171
All Active Projects
535
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2022

May 1, 2023

img_map_placeholder

Capri Dr & Flanders S, High Point, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.