BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Gowrie, Iowa. Completed plans call for the renovation of a three-story above grade educational facility.

Project consists of adding air conditioning to the practice gymnasium, ag classroom, drafting classroom, kitchen and 3-story classroom building areas that currently do not have air conditioning. Bids will be received for the following Work: Single Prime Contract (all trades). Award of the Contract shall be to the lowest responsive, responsible bidder determined on the basis of the Base Bid. Neither the Owner nor its agents will assume liability for the inability of the bidder to submit a bid in a timely manner. Bids received after the deadline will be rejected. Bidders bear full and complete responsibility for the timely submission of such bid. Time of receipt shall be the time recorded and determined by the Owner or designee. All bids shall be filed on forms included in the Project Manual, furnished by the Engineer, sealed and plainly marked. Any alteration of the bid form may be cause for rejection of the proposal. Each bid shall be made on the form furnished by the Engineer, and must be accompanied by a deposit of money, Certified Check, Cashier's Check, or Credit Union Certified Share Draft, or a Bid Bond to be executed by a corporation authorized to contract as a surety in the state of Iowa, in an amount equal to five percent (5%) of the amount of the Bid, made payable to Southeast Valley Community School District, Gowrie, Iowa, and may be cashed by the Board as liquidated damages in the event the successful Bidder fails to enter into a Contract and file bond satisfactory to the Board assuring the faithful fulfillment of the Contract and maintenance of said improvements as required by law, the provisions of this notice and the Contract Documents within ten (10) days after acceptance of his Bid. State Sales Tax: This project is tax exempt. Do not include state sales tax in any calculation of Bid totals. Contractor will be provided with Iowa sales tax exemption number for this project. Bid Security of the two lowest Bidders will be retained until contract has been awarded and executed, but no longer than 30 days after the opening of bids. No Bidder may withdraw their bid within 30 days after opening of bids. The successful Bidder will be required to furnish a Performance Bond and Material and Labor Payment Bond in an amount equal to one hundred percent (100%) of the Contract Sum, issued by a responsible surety approved by the Board and shall guarantee the faithful performance of the Contract and terms and conditions therein contained and the maintenance of said improvements pursuant to the provisions of the Contract Documents. Bids shall remain in effect for a period of thirty (30) days, commencing on bid due date. Monthly estimates will be paid to the Contractor as the work progresses in amounts equal to ninety-five percent (95%) of the Contract value of the work completed during the preceding calendar month. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work, partially or totally completed. Final payment of the five percent (5%) retainage due to the Contractor will be made thirty (30) days after final acceptance of the work under the Contract by the Owner if no claims are on file and after receipt of satisfactory evidence that all claims pertaining to such Contract have been paid in full as provided in the Contract Documents for said work. Fabrication of new work shall begin immediately after contracts are signed and insurance certificates are approved. Verify work schedule with Owner and Engineer. The complete system shall be substantially complete by August 3, 2023 with the final completion date being August 18, 2023. The Board reserves the right to reject any or all bids, re-advertise for all bids and to waive any or all formalities that may be in the best interest of the School District.

Post-Bid

Educational

$755,000.00

Public - City

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
41
Bidding Soon
462
All Active Projects
253
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2022

November 11, 2022

img_map_placeholder

1005 Riddle St, Gowrie, IA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.