Published November 9, 2022 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Addison, Illinois. Completed plans call for site work for a water / sewer project.

The Project consists of existing water main and appurtenances replacement on Winthrop Ave and Park Street. The project also includes new water services, casing pipe installation, full depth pavement patches over the water main trench within the Winthrop Ave and Park Street Pavement, removal and replacement of curb and gutter, sidewalks, driveways, and parkway restoration. Water services consist of providing new corporation stops and curb stops for single family residential services. The old curb stop will be removed, and a new copper line will be coupled to the old water service line and run to the new curb stop. Briefly and without force and effect upon the contract documents, the work locations can be summarized as follows: Winthrop Ave and Park Street consist of 2340 L.F. of watermain replacement. Addison 2022 Water Main Improvements This project will have a start date of November 14th, 2022 and have a final completion date of May 1st, 2023. This is an Illinois Prevailing Wage project. All bids must be submitted on the forms provided and returned in a sealed envelope. The self-addressed label provided with the bid document must be affixed to the outside of the sealed envelope. A bid bond, certified check, bank draft or irrevocable letter of credit on a solvent bank, payable to the Village of Addison, or cash in an amount of not less than ten percent (10%) of the amount of the bid shall be submitted with each bid. The successful bidder will be required to furnish a satisfactory performance bond in the amount equal to one hundred percent (100%) of the Contract sum as a security for the faithful performance of the Contract and also a Payment Bond in the amount equal to one hundred percent (100%) of the Contract Sum as a security for the furnishing materials in connection of the contract. The successful bidder shall also furnish a Certificate of insurance. No bid shall be withdrawn after opening of bids without the consent of said Municipality for a period of sixty (60) days after the schedule time of opening bids. Minorities and women-own businesses (W.B.E.) are encouraged to participate. The Village of Addison reserves the right to waive all technicalities, and to accept and or reject part(s) of any or all bids which it deems advantageous.

Award

Water / Sewer

$759,738.00

Public - City

Site Work

10

11

3

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Aids, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Backfill
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
157
Bidding Soon
2,361
All Active Projects
990
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2022

November 14, 2022

img_map_placeholder

Multiple Locations, Addison, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 Addison Watermain Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.