Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Corbin, Kentucky. Completed plans call for the construction of a stadium; for site work for a educational facility; and stadium.
Project consists of the Construction of a new field/stadium entrance, ticket booths, restrooms, concession area, end zone seating/concourse and installing new synthetic/artificial turf field. Proposal Forms must be properly completed. No modification, qualification letters or statements will be considered. Such shall be cause for rejection of bid. No bid shall be modified, withdrawn, or cancelled by the Bidder for a period of sixty (60) days following the time and date designated for receipt of bids and bidder agrees in submitting his bid. Sealed Bids will be received for the following Work: 1. Multiple Contract Project consisting of the following prime contracts: a. 0300 -- General Trades b. 0400 -- Masonry C. 0500 -- Structural Steel d. 0700 -- Roofing and Sheet Metal e. 0820 -- Doors and Hardware f. 0840 -- Aluminum Windows g. 0950 -- Wall Finish and Ceilings h. 0990 -- Painting 1. 1000 -- Specialties j. 1260 - Seating k. 2223 -- Plumbing and HVAC I. 2600 -- Electrical m. 3100---- Site Excavation n. 3200 -- Asphalt Paving O. 3218 -- Synthetic Field Turf Successful bidders shall commence the Work October 31, 2022 and shall complete the Work by September 1, 2023. Work is subject to liquidated damages at $500.00 per calendar day. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. Successful bidders will be required to furnish and pay for satisfactory Performance and Payment Bonds. The bonds shall cover the entire base bid and any accepted alternates. This Advertisement for Bids documents issued by Hacker Brothers, Inc. Hacker Brothers, Inc. is the Construction Manager for this project, acting in the Owner' behalf in soliciting proposals. Each successful bidder will execute a Contract directly with the Owner and not with the Construction Manager. Viewing Procurement and Contracting Documents: 1. Office of the Architect: Clotfelter/Samokar, 228 East Reynolds Road, Suite One, Lexington, Kentucky 40517, Phone (859) 273-3700 2. Office of the Construction Manager: Hacker Brothers, Inc., 116 East 4th Street, London, Kentucky 40741, Phone (606) 877-2029. 3. Office of the Owner: Corbin Independent Board of Education, 108 Roy Kidd Avenue, Corbin, KY 40701. Phone (606) 528-1303. The Form of Proposal must be requested and obtained from the Construction Manager, Hacker Brothers, Inc., 116 East 4th. London, KY 40741, (606) 877-2029, fax (606) 877-2041. It shall be the responsibility ofthe bidder to determine which Bid Packages or Packages the bidder desires to Bid. 1. All bids shall be submitted only on the Form of Proposal prepared by Hacker Brothers, Inc. Bid security shall be submitted with each bid in the amount of 5 (Five) percent of the bid amount for each bid over $25,000.00. No bids may be withdrawn for a period of 60 (Sixty) days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. a. 0300 -- General Trades -Hacker Brothers, Inc. 3,598,115.00 b. 0400 -- Masonry -The Rock, LLC 510,920.00 C. 0500 -- Structural Steel -Fab Steel, Inc. 583,900.00 d. 0700 -- Roofing and Sheet Metal -Dixie Roofing, Inc. 197,505.00 e. 0820 -- Doors and Hardware -The Atlas Companies 45,700.00 f. 0840 -- Aluminum Windows -WR Cole and Associates 74,900.0 g. 0950 -- Wall Finish and Ceilings-C&N Wall and Ceiling Construction 143,700.00 h. 0990 -- Painting -True Colors, LLC. 20,707.00 1. 1000 -- Specialties - The Atlas Companies 53,300.00 j. 1260 - Seating -The Atlas Companies 28,400.00 k. 2223 -- Plumbing and HVAC - CKSM Mechanical 365,000.00 I. 2600 -- Electrical -Blue Sky Electric 430,000.00 m. 3100---- Site Excavation -Del Mae, LLC 577,711.00 n. 3200 -- Asphalt Paving - ATS Construction 164,200.00 O. 3218 -- Synthetic Field Turf -Oheil Site Solutions 1,192,000.00
Bid Results
Arenas / Stadiums
$7,986,058.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2022
October 31, 2022
410 Barbourville St, Corbin, KY
Related To This Project
Corbin, KY
--
Corbin, KY
Bid Date: Jul 22 2022
Corbin, KY
Bid Date: Feb 01 2022
Corbin, KY
Bid Date: Dec 02 2022
Corbin, KY
Bid Date: May 26 2022
Corbin, KY
Bid Date: May 11 2022
Corbin, KY
Bid Date: Jun 27 2022
Corbin, KY
Bid Date: Nov 03 2022
Frankfort, KY
Bid Date: Oct 20 2022
Versailles, KY
Bid Date: Oct 20 2022
Bowling Green, KY
Bid Date: Oct 20 2022
Glasgow, KY
Bid Date: Oct 04 2022
Mayfield, KY
Bid Date: Oct 13 2022
Independence, KY
Bid Date: Sep 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.