Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Monterey, California. Working plans call for the renovation of a water / sewer project.
**As of December 01,2022, bids received were rejected. Project will rebid but no definite date yet.** FILE: 22D2C-ED1 .DWG Final Effluent Monitoring Station Project. Final Effluent Monitoring Station Project SUMMARY OF WORK: Monterey One Water (M1W) is requesting bids for construction of a new Prefabricated Metering Manhole (PMM) utilizing a Palmer-Bowlus flow meter with associated electrical/instrumentation/SCADA at the Regional Treatment Plant. Work will include installing two access ways in the existing 60-inch RCP Outfall to allow installation of a temporary flow bypass system then removal of existing pipe to be replaced with the PMM The Work of this Contract consists of construction of a new Prefabricated Metering Manhole (PMM) with 54-inch Palmer-Bowlus flume on the existing Monterey One Water (M1W) 60-inch ID reinforced concrete Land Outfall pipe. An ultrasonic level measuring device is to be installed in the PMM to measure the flow in the Outfall. There is flow in the Outfall pipe at all times. Consequently, construction of the PMM will include the construction of two access manwaysin the Outfall pipe, one upstream of the proposed PMM and one downstream of the PMM. These manways will be used in this Project to implement the required flow bypass system, which will require the use of temporary flow bypass pumps and temporary bypass piping laid on grade. The upstream manway (Manway B) will serve as the point at which flow is diverted from the Outfall around the construction site of the PMM. An inflatable plug must be installed into the Land Outfall pipe, on the downstream side of Manway B to prevent flow continuing toward the construction location for the PMM and will be used for installation of the suction pipes for the flow bypass pumps. Manway A constructed on the Outfall pipe downstream of the PMM construction site will serve as the point at which bypassed flow is returned to the Outfall for continuation to the Ocean discharge. An inflatable plug must be installed into the Outfall pipe through Manway A and be placed immediately upstream of Manway A to prevent the returned flow from backing up in the Outfall pipe to the site where the PMM is being installed. B. In addition to construction of the new flow measurement structure and the associated appurtenances required to implement the required flow bypass, the project includes construction of electrical and control panels for the flowmeter equipment and construction of conduit and electrical and instrumentation wiring required to incorporate the flowmeter data into M1W's SCADA system. Additionally, conduit and wiring are included in the Project to bring power to and SCADA signal to and from the existing RTP entry gate control panel.
Final Planning
Water / Sewer
$4,335,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 9, 2022
June 1, 2023
Multiple Locations, Monterey, CA
Related To This Project
Monterey, CA
Bid Date: Oct 25 2022
Monterey, CA
Bid Date: Oct 25 2022
Monterey, CA
Bid Date: Oct 25 2022
Monterey, CA
--
Monterey, CA
Bid Date: Jan 06 2023
Monterey, CA
Bid Date: Dec 01 2022
Monterey, CA
Bid Date: Dec 06 2022
Monterey, CA
Bid Date: Sep 15 2022
Monterey, CA
Bid Date: Dec 08 2022
Monterey, CA
Bid Date: Oct 11 2022
Monterey, CA
Bid Date: Oct 11 2022
Monterey, CA
Bid Date: Oct 11 2022
Monterey, CA
Bid Date: Sep 27 2022
Monterey, CA
Bid Date: Oct 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.