BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Monterey, California. Working plans call for the renovation of a water / sewer project.

**As of December 01,2022, bids received were rejected. Project will rebid but no definite date yet.** FILE: 22D2C-ED1 .DWG Final Effluent Monitoring Station Project. Final Effluent Monitoring Station Project SUMMARY OF WORK: Monterey One Water (M1W) is requesting bids for construction of a new Prefabricated Metering Manhole (PMM) utilizing a Palmer-Bowlus flow meter with associated electrical/instrumentation/SCADA at the Regional Treatment Plant. Work will include installing two access ways in the existing 60-inch RCP Outfall to allow installation of a temporary flow bypass system then removal of existing pipe to be replaced with the PMM The Work of this Contract consists of construction of a new Prefabricated Metering Manhole (PMM) with 54-inch Palmer-Bowlus flume on the existing Monterey One Water (M1W) 60-inch ID reinforced concrete Land Outfall pipe. An ultrasonic level measuring device is to be installed in the PMM to measure the flow in the Outfall. There is flow in the Outfall pipe at all times. Consequently, construction of the PMM will include the construction of two access manwaysin the Outfall pipe, one upstream of the proposed PMM and one downstream of the PMM. These manways will be used in this Project to implement the required flow bypass system, which will require the use of temporary flow bypass pumps and temporary bypass piping laid on grade. The upstream manway (Manway B) will serve as the point at which flow is diverted from the Outfall around the construction site of the PMM. An inflatable plug must be installed into the Land Outfall pipe, on the downstream side of Manway B to prevent flow continuing toward the construction location for the PMM and will be used for installation of the suction pipes for the flow bypass pumps. Manway A constructed on the Outfall pipe downstream of the PMM construction site will serve as the point at which bypassed flow is returned to the Outfall for continuation to the Ocean discharge. An inflatable plug must be installed into the Outfall pipe through Manway A and be placed immediately upstream of Manway A to prevent the returned flow from backing up in the Outfall pipe to the site where the PMM is being installed. B. In addition to construction of the new flow measurement structure and the associated appurtenances required to implement the required flow bypass, the project includes construction of electrical and control panels for the flowmeter equipment and construction of conduit and electrical and instrumentation wiring required to incorporate the flowmeter data into M1W's SCADA system. Additionally, conduit and wiring are included in the Project to bring power to and SCADA signal to and from the existing RTP entry gate control panel.

Final Planning

Water / Sewer

$4,335,000.00

Public - County

Renovation

35

25

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
62
Bidding Soon
1,295
All Active Projects
564
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 9, 2022

June 1, 2023

img_map_placeholder

Multiple Locations, Monterey, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.