BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 9, 2024 at 7:00 PM

Updated February 10, 2024

Demolition, site work and new construction of a mixed-use development in Taylorsville, Utah. Completed plans call for site work for a educational facility; for the demolition of a theater / auditorium; for the construction of a theater / auditorium; and theater / auditorium.

Salt Lake Community College (SLCC) is requesting bids for the construction of the following project - Salt Lake Community College (SLCC) Taylorsville Redwood Campus Alder Amphitheater Redesign Construction Cost Estimate: $ 2,370,000.00 Completion Time: 245 days Liquidated Damages: $800.00 A bid bond in the amount of five percent (5%) of the bid amount, made payable to Salt Lake Community College on the AIA Document A310 - 2010 Bid Bond, or equivalent, shall accompany the bid submission. Question Deadline 12/04/2023 at 3:00 PM Each prerequisite and question has additional information that can be viewed by logging into U3P and clicking on the corresponding link. The Owner reserves the right to reject any or all sub-contractors who have previously performed unsatisfactorily for the Owner or who do not meet the requirements specified in other sections of these specifications 21112.

Post-Bid

Theaters / Auditoriums

$2,370,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

49

26

16

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
79
Bidding Soon
1,021
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2023

February 9, 2024

Project location map

4600 S Redwood Rd, Taylorsville, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.