BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2022 at 8:00 PM

Updated January 25, 2024

Site work and paving for a mixed-use development in Pendleton, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The existing McCarty-Pendleton Regulated Drain will be reconstructed and rerouted to alleviate current drainage issues in the area. This work will be completed in two phases. The first phase will be the reconstruction of the intersection at Pendleton Avenue and Reformatory Road. This will involve full-depth pavement replacement and culvert realignment. The second phase will be the reconstruction of the McCartyPendleton Regulated Drain. This work will involve removing/crushing the old pipe, removing structures, dewatering, installing new pipe and structures, repairing some road and sidewalk areas, and minor grading. Phase 1 is to be completed by May of 2023 and Phase 2 is to be completed by March of 2023. Bids shall be properly and completely executed on Bid Forms and in the order as identified and contained in the Contract Documents obtainable from the offices as stated above. Each bid shall be accompanied by a completely filled out Form No. 96, including attachment of Contractor's Financial Statement as stipulated in Section III, E-Verify Certification Form and acceptable Bid Security. Any bid not accompanied by the above-required items shall be deemed a non-responsive bid. No Bidder may withdraw his bid within a period of 60 days following the date set for the receiving of bids. The Owner reserves the right to retain all bids for a period of not more than 60 days and said bid shall remain in full force and effect during said time. The Owner further reserves the right to waive informalities and to award the Contract to any Bidder, all to the advantage of the Owner or to reject all bids. Each bid shall be accompanied by an acceptable certified check made payable to the Town of Pendleton or an acceptable bid bond in the amount equal to five (5%) percent of the total bid price executed by an incorporated surety company in good standing and qualified to do business in the State of Indiana and whose name appears on the most current Treasury Department Circular No. 570. A Performance Bond and Payment Bond each in the amount of 100 percent of the Contract price will be required from the Contractor to whom the work is awarded. Project no 21239

Award

Water / Sewer

$629,643.00

Public - City

Paving, Site Work

12

23

11

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
109
Bidding Soon
1,888
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2022

November 14, 2022

Project location map

S Pendleton Ave & Reformatory Rd, Pendleton, IN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.