Renovation of a medical facility in Palo Alto, California. Completed plans call for the renovation of a medical facility.

Project Description: Remove and replace the existing Dental Clinic Vacuum pump assembly with a new replacement assembly for the Veterans Affairs Palo Alto Health Care System (VAPAHCS), Building 100, BE 130 Basement Mechanical Room, 3801 Miranda Ave; Palo Alto, CA 94304. Scope of Work 1.0 General Intent 1.1 Remove and replace the existing Dental Clinic Vacuum pump assembly with a new replacement assembly for the Veterans Affairs Palo Alto Health Care System (VAPAHCS), Building 100, BE 130 Basement Mechanical Room, 3801 Miranda Ave; Palo Alto, CA 94304. 1.2 The contractor must perform to the standards in this contract. 1.3 This project shall take no longer than 180 calendar days from the notice to proceed (NTP) to complete. 1.4 This project shall be supervised by the appointed COR to ensure minimal impact of day-today activities on patient care. Scheduling of work shall be at the convenience of the Veteran Administration Palo Alto Health Care System. 1.5 The Security & Accreditation package is not required, and C & A (certification and accreditation (authorization) ) requirements do not apply as this equipment is not for information nor communication. (ISO, Privacy Office) 2.0 General Information and Requirements 2.1 The objective of this project is to replace the existing Dental Clinic Vacuum beyond its service life minimalizing downtime to an active Dental Clinic. Some weekend/off hours work will be necessary to not adversely affect patient care during Utility Shutdowns. 2.2 This project shall follow Critical Path Method (CPM) and take no longer than 180 calendar days from the notice to proceed to complete. 2.3 The contractor shall provide all tools, equipment, and personal protective equipment necessary to complete this project safely. Contractor shall follow safety regulations, this SOW, all related specifications, applicable code, Underwriters Laboratories (UL), Nationally Recognized Testing Laboratory (NRTL) requirements. Contractor shall follow rules including but not limited to Health Care System Memorandums (HCSM), current California/ County of Santa Clara COVID 19 restrictions, Federal OSHA, Lock-Out-Tag-Out (LOTO), signs, VA Police, Standards of behavior of this facility. 2.4 Normal facility work hours will be 8:00am - 4:30 pm Monday-Friday excluding Government holidays. Schedules outside of work hours will be approved by the COR. It is the intent of the Palo Alto VA Medical Center that the work is to be completed with minimal interruptions to the facility and within 180 calendar days from the issuance of the Notice to Proceed (NTP). 2.4.1 The facility policy on utility shutdowns of major magnitude requires a minimum of 30 days notice to the tenants. Outage requests shall be submitted by the contractor prior to that date for evaluation and processing SITE VISIT INFORMATION Time: 8:00 AM PST Date: 10/03/2022 Location: 3801 Miranda Ave, Palo Alto, CA 94304, Building 100, in the front of the building just inside the screening area RFI Due Date: 12:00 PM PST, 7 October 2022 to Destiny Dyson (destiny.dyson@va.gov) Offer due date: 12:00 PM PST, 13 October 2022 to destiny.dyson@va.gov All documentation must be submitted electronically to destiny.dyson@va Project 640-23-912 Palo Alto Division Building 100 Dental Vacuum Replacement The contractor shall provide all tools, equipment, and personal protective equipment necessary to complete this project safely. Contractor shall follow safety regulations, this SOW, all related specifications, applicable code, Underwriters Laboratories (UL), Nationally Recognized Testing Laboratory (NRTL) requirements. Contractor shall follow rules Nationally Recognized Testing Laboratory (NRTL) requirements. Contractor shall follow rules including but not limited restrictions, Federal OSHA, Lock Out-Tag-Out (LOTO), signs, VA Police, Standards of behavior of this facility. Magnitude is between $100,000 and $250,000. BID GUARANTEE: Nor required PERFORMANCE & PAYMENT BONDS: Not required *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Medical

$250,000.00

Public - Federal

Renovation

110

11

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
73
Bidding Soon
1,509
All Active Projects
653
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2022

November 23, 2022

img_map_placeholder

3801 Miranda Ave, Palo Alto, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.