EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 16, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

It is the intent of the PWSA to establish a contract to perform/provide a new electrical service feed and installation of an EV charging station provided to the contractor by PWSA at the main water treatment plant. Services/material in this scope are for a 'turn key installation' including but not limited to new main breakers, electrical conduit and feeder cables, disconnect switch/EPO underground duct bank to new charging station, foundation for charging station, installation of charging station, completing manufacturers training for installation of charging station, startup of charging station, charging station signage, curb painting, and site restoration of the area surrounding the new charging station. The Contractor shall provide all labor, material, equipment, tools, and appurtenances necessary to complete the scope of work. Questions Due Date: Oct 20th 2022, 4:00 PM EDT Bid bond -NA SCOPE OF WORK It is the intent of the PWSA to establish a contract to perform/provide a new electrical service feed and installation of an EV charging station provided to the contractor by PWSA at the main water treatment plant. Services/material in this scope are for a 'turn key installation' including but not limited to new main breakers, electrical conduit and feeder cables, disconnect switch/EPO underground duct bank to new charging station, foundation for charging station, installation of charging station, completing manufacturers training for installation of charging station, startup of charging station, charging station signage, curb painting, and site restoration of the area surrounding the new charging station. The Contractor shall provide all labor, material, equipment, tools, and appurtenances necessary to complete the scope of work. See construction drawings and specifications attachments included for additional details. Scheduling Meeting/Visitors o Visitors: At least 48 hours prior to a visitor arriving, the PWSA employee (sponsor) should notify the following staff via email or phone. The email should provide the name of the visitor(s) and the purpose of the meeting (i.e., interview, contractor walkthrough, regulatory meeting): Tasha Crafton Aimee Butch Administrative Assistant Office Manager tcrafton@pgh2o.com abutch@pgh2o.com (412) 782-7552 x 5659 (412) 782-7552 x 5550

Award

Water / Sewer

$47,951.00

Public - City

Renovation

11

11

4

11

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Project Identification, Execution and Closeout Requirements, Execution, Erection, Cleaning and Waste Management, Commissioning
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Audio-Video Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
69
Bidding Soon
875
All Active Projects
424
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

December 26, 2022

img_map_placeholder

900 Freeport Rd, Pittsburgh, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

PWSA Main Water Treatment Plant EV Fast Charging Station

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.