BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Empire, Colorado. Completed plans call for site work for a bridge / tunnel; water / sewer project; road / highway; and for paving for a road / highway.

Contract Award Date: Mar 03, 2023 Contract Award Number: 1240LT23C0007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: V4GVJZF4S263 Contractor Awarded Name: Nakupuna Solutions, LLC Contractor Awarded Address: Arlington, VA 22202-3410 USA Base and All Options Value (Total Contract Value): $595,863.00 Arapaho and Roosevelt National Forests and Pawnee National Grasslands Project Name: Mizpah Campground Aquatic Organic Passage Project Location: Mizpah Campground is located approximately 6 miles west of Empire, Colorado, along US-40. The project location is located on NFSR 250, approximately 360 feet south of US-40.. Period of Performance: 03/01/2023 to 11/30/2023 Between $500,000 and $1,000,000. The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. DESCRIPTION OF WORK: The work for this contract includes all labor, materials, supplies, and equipment for the installation of an AOP, to include but not limited to: - Design, Excavate and Construct the footings. - Install traffic control signs and close National Forest System Road 250. - Install the stream-flow diversion system. - Construct the channel bed and banks within the structure. - Supply and install the precast box culvert. - Remove stream-flow diversion system and return flow to the channel. - Install structural backfill and embankment. - Place surface aggregate. - Install object markers. - Remove signs and re-open National Forest System Road 250. - Seeding, planting, and final site work. - Fell and place dead trees on upstream floodplain In addition to the installation of the AOP, a requirement of this contract is to provide a design for the structure footings for review that is coordinate with the structure supplier and approved by an engineer licensed in Colorado. All available information for this task is provided in this contract.

Award

Water / Sewer

$595,863.00

Public - Federal

Paving, Site Work

22

16

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
38
Bidding Soon
1,008
All Active Projects
424
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

March 1, 2023

img_map_placeholder

NFSR 250, Empire, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.