EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 6, 2023 at 7:00 PM

Updated October 1, 2024

Demolition, site work and asbestos abatement for a mixed-use development in Doylestown, Pennsylvania. Completed plans call for the demolition of a detention facility; for site work for a detention facility; for asbestos abatement for a detention facility; water / sewer project; and water / sewer project.

Asbestos Abatement and Underground Tank Removal for Demolition of Former Women's Community Corrections Center. The work to be done under these contracts consists of all labor, equipment, materials, and other facilities necessary and proper to complete-in-place the Demolition of Former Women's Community Correction Center-Contract A: Asbestos Abatement, Contract B: Underground Storage Tank Removal. Please note, bidders proposing to submit a bid on this project are required to be pre-qualified in accordance with Ordinances 162 and 167, by submitting a Contractor Responsibility Certification Form at least 14 calendar days prior to the specified bid submission date. Ordinances 162, 167 and the Contractor Responsibility Certification Form are included in the bid package. CLARIFICATION DEADLINE 10/31/2022 12:00 PM

Award

Jails / Prisons

$143,150.00

Public - County

Asbestos Abatement, Demolition, Site Work

8

18

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Contaminated Site Material Removal, Underground Storage Tank Removal, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Windows, Glazing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Resilient Flooring, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
519
Active Projects
265
Bidding Soon
4,458
All Active Projects
2,118
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2022

December 7, 2022

img_map_placeholder

55 E Court St, Doylestown, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Asbestos Abatement and Underground Tank Removal for Demolition of Former Women's Community Corrections Center

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.