BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2022 at 7:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Libby, Montana. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.

As of Nov 14 the project was awarded to Hi-Tech Rockfall Construction Inc for $1,475,125.48. Rock scaling, installation of rockfall mitigation structures, and cleaning out the roadside ditch on the US-2 Slope Stability project located in Lincoln County. The project begins approximately 12 miles west of the town of Libby at RP 20.4 and extends east approximately 0.3 miles along US Highway 2 (N-1) ending at RP 20.6. This project is under the jurisdiction of the Butte District Administrator. Uniform No. 9993000 MTDOT - 210 - Slope Stability

Award

Bridges / Tunnels

$1,475,125.00

Public - State/Provincial

Paving, Site Work

18

5

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
7
Bidding Soon
147
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

December 26, 2022

Project location map

US-2, Libby, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.