BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in League City, Texas. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Update: https://www.leaguecitytx.gov/DocumentCenter/View/42501/Parks-PDF The Texas Department of Transportation (TxDOT) contacted the City for a potential partnership, through a grant opportunity, to construct a Hike and Bike Trail from Ross Elementary School to Palomino Road. The proposed 10' wide Hike and Bike Trail will run on both the North and South sides of FM 518 from Ross Elementary School to Palomino Road. The distance is 1 mile for a total of 2 miles of trail at an estimated total cost of $2,918,817. This opportunity will leverage $583,763 of City funds, into $2,918,817 through a 20/80 match program to be managed by TxDOT. The City's match will come from 4B funds. The 4B Board approved support at the December 1, 2014 meeting with the understanding that with the approval of this project, a portion of the PK 1202 (Hike & Bike Phase 1 Project) may be delayed. The 4B Board felt that this was an excellent opportunity to leverage its funds and reprioritize its projects when matching funds are available. The trails will be located in TxDOT right-of-way and will be maintained by TxDOT upon completion. Funding from TxDOT will be let on January 2024 (as of February 2023). Project will be designed by TxDOT. Project is included City of League City Fiscal Year 2024-2028 Page no 25 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Texas Department of Transportation (TxDOT) contacted the City for a potential partnership, through a grant opportunity, to construct a Hike and Bike Trail from Ross Elementary School to Palomino Road. The proposed 10 wide Hike and Bike Trail will run on both the North and South sides of FM 518 from Ross Elementary School to Palomino Road. The distance is 1 mile for a total of 2 miles of trail at an estimated total cost of $2,918,817. This opportunity will leverage $583,763 of City funds, into $2,918,817 through a 20/80 match program to be managed by TxDOT. The Citys match will come from 4B funds. The 4B Board approved support at the December 1 2014 meeting with the understanding that with the approval of this project, a portion of the PK 1202 (Hike & Bike Phase 1 Project) may be delayed. The 4B Board felt that this was an excellent opportunity to leverage its funds and reprioritize its projects when matching funds are available. The trails will be located in TxDOT right-of-way and will be maintained by TxDOT upon completion. Funding from TxDOT will be let on 10/15/2022 (estimated date). Project will be designed by TxDOT. Project is included City of League City 2023-2027 Budget CIP . *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$2,918,817.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
318
Active Projects
210
Bidding Soon
4,055
All Active Projects
1,650
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 2, 2025

img_map_placeholder

Multiple Locations, League City, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.