BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2025 at 8:00 PM

Updated July 3, 2025

Site work and paving for a mixed-use development in League City, Texas. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

UPDATE : This project provides for construction of a trail/sidewalk and pedestrian bridge improvements along Texas Avenue and Webster Street from FM 518 to League City Intermediate School and Goforth Elementary School. The project will provide safer access for students and will tie into the city’s existing trail system, completing portions of the Master Trails Plan. The costs have been updated since the estimates were developed for the SRTS grant project in 2018-2019 (which focused on Webster Street) and expanded to include the Texas Avenue area. The plans for the trail to Goforth Elementary School and League City Intermediate School include 6’ concrete walkways, a pedestrian bridge and a signalized intersection at Highway 270 and Webster Street. The limits of the project will be developed as this project moves forward. Project is in City of League City capital budget fy 2025-2029 CIP _____________________________________________________________________________________ Update: https://www.leaguecitytx.gov/DocumentCenter/View/42501/Parks-PDF This project provides for construction of a trail/sidewalk and pedestrian bridge improvements along Texas Avenue and Webster Street from FM 518 to League City Intermediate School and Goforth Elementary School. The project will provide safer access for students and will tie into the city's existing trail system, completing portions of the Master Trails Plan. The costs have been updated since the estimates were developed for the SRTS grant project in 2018-2019 (which focused on Webster Street) and expanded to include the Texas Avenue area. The plans for the trail to Goforth Elementary School and League City Intermediate School include 6' concrete walkways, a pedestrian bridge and a signalized intersection at Highway 270 and Webster Street. The limits of the project will be developed as this project moves forward. Project is included City of League City Fiscal Year 2024-2028 Page no 32 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project provides for construction of a trail/sidewalk and pedestrian bridge improvements along Texas Avenue and Webster Street from FM 518 to League City Intermediate School and Goforth Elementary School. The project will provide safer access for students and will tie into the citys existing trail system, completing portions of the Master Trails Plan. The costs have been updated since the estimates were developed for the SRTS grant project in 2018-2019 (which focused on Webster Street) and expanded to include the Texas Avenue area. The plans for the trail to Goforth Elementary School and League City Intermediate School include 6 concrete walkways, a pedestrian bridge and a signalized intersection at Highway 270 and Webster Street. This project is in included in the City's or County's FY 2023-2027 Capital Improvement Plan (CIP). As of September 30, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,592,500.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
189
Bidding Soon
3,331
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2028

Project location map

Texas Ave, League City, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.